Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
ApprovedCouncil status: Approved
TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
Last published check: 10 Nov 2026, 21:18. Check the council record for more recent changes.
Last published check: 10 Nov 2026, 21:18 (UK)
Dates come from the council record. A target date passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDetails of Site Investigation Report pursuant to condition 51 (Phase 3 Enabling and Phase 3 Construction) of planning permission ref: 243527VAR, dated 26/06/2025 for: Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA, dated 28/03/2024, and ref: 243393NMA, dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsDocuments open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.