Council planning record

Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary)The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)

Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL

Awaiting decisionReference: 263110NMAR3London Borough of Ealing

Last published check: 9 Oct 2026, 00:51. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Non-Material Amendment Reg 3
Received
14 Aug 2026
Validated
14 Aug 2026
Determination deadline
10 Sept 2026
Local authority
London Borough of Ealing

Application overview

Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary)The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)

Proposal details

Reference
263110NMAR3
Alternative references
PP-15154659
Ward
Pitshanger
Agent
Tibbalds Planning and Urban Design

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL

This record has no verified map location.

View council map

Documents 30 of 30

DocumentPublishedAction
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF14 Aug 2026View
GLC-GT3-00-00-DR-A-080002-PROPOSED GROUND FLOOR PLAN-PL02Drawing · PDF14 Aug 2026View
GLC-GT3-00-B1-DR-A-080001-PROPOSED LOWER GROUND FLOOR PLAN-PL02Draw - Prop Floor Plan · PDF14 Aug 2026View
GLC-GT3-00-01-DR-A-080003-PROPOSED FIRST FLOOR PLAN-PL02Drawing · PDF14 Aug 2026View
GLC-GT3-00-02-DR-A-080004-PROPOSED ROOF PLAN-PL02Drawing · PDF14 Aug 2026View
GLC-GT3-00-ZZ-DR-A-080101-PROPOSED GA SECTIONS SHEET 1-PL02Draw - Prop Section · PDF14 Aug 2026View
GLC-GT3-00-ZZ-DR-A-080102-PROPOSED GA SECTIONS SHEET 2-PL02Drawing · PDF14 Aug 2026View
GT3 ARCHITECTS GURNELL LEISURE CENTER REGISTER_PL02Drawing · PDF14 Aug 2026View
GLC-GT3-00-ZZ-DR-A-080052-PROPOSED GA ELEVATIONS SHEET 2-PL02Drawing · PDF14 Aug 2026View
GLC-GT3-00-ZZ-DR-A-080051-PROPOSED GA ELEVATIONS SHEET 1-PL02Drawing · PDF14 Aug 2026View
GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART1Drawing · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART3Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2Supporting Documentation · PDF14 Aug 2026View
ENERGY STATEMENT NMA TECHNICAL NOTESupporting Documentation · PDF14 Aug 2026View
CIRCULAR ECONOMY NMA TECHNICAL NOTESupporting Documentation · PDF14 Aug 2026View
LANDSCAPE MASTERPLAN-PROPOSED HARD LANDSCAPE_P03Drawing · PDF14 Aug 2026View
GLC-TML-ZZ-ZZ-RP-L-000002-LANDSCAPE AMENDMENT REPORT_P07_PART 1Drawing · PDF14 Aug 2026View
GLC-TML-ZZ-ZZ-RP-L-000002-LANDSCAPE AMENDMENT REPORT_P07_PART 4Drawing · PDF14 Aug 2026View
GLC-TML-ZZ-ZZ-RP-L-000002-LANDSCAPE AMENDMENT REPORT_P07_PART 3Drawing · PDF14 Aug 2026View
GLC-TML-ZZ-ZZ-RP-L-000002-LANDSCAPE AMENDMENT REPORT_P07_PART 2Drawing · PDF14 Aug 2026View
0106-PR-ZZ-ZZ-DR-L-2001-007_PROPOSED SECTION 02Draw - Prop Section · PDF14 Aug 2026View
0106-PR-ZZ-ZZ-DR-L-2003-004_PROPOSED SECTION 04Draw - Prop Section · PDF14 Aug 2026View
PLANNING STATEMENT ADDENDUM AUGUST 2026Planning Statement · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE01Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE02Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE03Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE04Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE05Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE06Supporting Documentation · PDF14 Aug 2026View
22019-GT3-00-XX-RP-A-31-GURNELL LEISURE CENTRE PLANNING CHANGES-P06_PART2(PAGE07Supporting Documentation · PDF14 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.