Council planning record

Details of a stage 1 written scheme of investigation (WSI) pursuant to condition 11(Part b) of planning permission ref: 250949FUL dated 19/12/2025 for: Site clearance and preparation, including demolition of all existing buildings on site and redevelopment of the site to provide: Construction of four data centre units within three buildings of approximately 67.9m AOD in height (Use Class B8, approximately 158,702sqm GEA), four industrial buildings ranging from approximately 41.3m to 46.2m AOD in height (Use Classes B8, B2 and E(g)(iii), approximately 23,389 GEA), central pavilion building of approximately 35m AOD in height (Use Class E(b), approximately 223 GEA), two substations (38.05m AOD in height), associated plant, enclosures and necessary physical security systems, internal roads, servicing, circulation, car and cycle parking and hard and soft landscaping works. This application is accompanied by an Environmental Statement for the purposes of Environmental Impact Assessment under The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).

International Trading Estate Trident Way Southall UB2 5LF

ApprovedReference: 262984CNDLondon Borough of Ealing

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Approved
Application type
Discharge Condition
Received
4 Aug 2026
Validated
4 Aug 2026
Determination deadline
29 Sept 2026
Local authority
London Borough of Ealing

Application overview

Details of a stage 1 written scheme of investigation (WSI) pursuant to condition 11(Part b) of planning permission ref: 250949FUL dated 19/12/2025 for: Site clearance and preparation, including demolition of all existing buildings on site and redevelopment of the site to provide: Construction of four data centre units within three buildings of approximately 67.9m AOD in height (Use Class B8, approximately 158,702sqm GEA), four industrial buildings ranging from approximately 41.3m to 46.2m AOD in height (Use Classes B8, B2 and E(g)(iii), approximately 23,389 GEA), central pavilion building of approximately 35m AOD in height (Use Class E(b), approximately 223 GEA), two substations (38.05m AOD in height), associated plant, enclosures and necessary physical security systems, internal roads, servicing, circulation, car and cycle parking and hard and soft landscaping works. This application is accompanied by an Environmental Statement for the purposes of Environmental Impact Assessment under The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).

Proposal details

Reference
262984CND
Alternative references
PP-15132855
Ward
Southall Green
Agent
Bella Moorhouse

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

International Trading Estate Trident Way Southall UB2 5LF

This record has no verified map location.

View council map

Documents 4 of 4

DocumentPublishedAction
DECISION NOTICEDecision · PDF2 Oct 2026View
OFFICERS REPORTOfficer Report · PDF2 Oct 2026View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF4 Aug 2026View
INTERNATIONAL TRADING ESTATE SOUTHALL WSI PHASE 1BSupporting Documentation · PDF4 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.