Council planning record

Minor material amendments (S.73) to vary, delete or add conditions in relation to condition no. 2 (Approved Plans), 5 (landscaping), 7 (Cycle Parking Spaces), 10 (Foundation Method Statement), 11 (Remediation), 13 (Drainage Strategy), 14 (Piling Method Statement),15 (Refuse and Recycling), 16 (Noise Mitigation Measures), 17 (Insultation Measures - commercial), 18 (Sound Level Rating - External Plant), 19 (Masts, Antennae & Satellite Dishes), 21 (Flood Risk Assessment), 25 (Business Hours), 26 (Commercial Units Use Class), 27 (Bat Survey Report), 28 (BREEAM), 29 (Energy Strategy), 31 (Dwelling Energy Performance Certificates), 32 (Commercial Spaces Energy Performance Certificates), 33 (Children's Play Space), 36 (Fire Statement) and 37 (Wind Assessment) and the inclusion of new conditions relating to sound insultation between residential units, fa�ade sound insultation measures and anti-vibration measures, pursuant to planning permission reference 171721FUL dated 02.02.2018 as varied by 203596NMA dated 17.09.2020 and pursuant to 213744VAR dated 08.12.2021 for 'Construction of buildings comprising residential units (Use Class C3), flexible retail space (Use Class A1/A2) (at ground floor of the building fronting Northfield Avenue), office space (Use Class B1) (at ground and lower ground of the building fronting Northfield Avenue), landscaping, access and servicing, car parking and associated works (following demolition of existing buildings).' Variation seeks four additional residential units; reduction in non-residential floorspace; decreasing the height of Block A (from 8 storeys to 6 storeys) and increasing the height of Block C from (from 3 and 4 storeys to 4 and 5 storeys); internal alterations to allow for sprinkler tank infrastructure; amendments to the car and cycle parking provision; other associated access and landscape works and varying the legal obligation.

Orion Park Northfield Avenue West Ealing W13 9SJ

Pending ConsiderationReference: 262479VARLondon Borough of Ealing

Last published check: 8 Oct 2026, 22:09. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending Consideration
Application type
Variation of Condition
Received
19 Jun 2026
Validated
19 Jun 2026
Determination deadline
18 Sept 2026
Local authority
London Borough of Ealing

Application overview

Minor material amendments (S.73) to vary, delete or add conditions in relation to condition no. 2 (Approved Plans), 5 (landscaping), 7 (Cycle Parking Spaces), 10 (Foundation Method Statement), 11 (Remediation), 13 (Drainage Strategy), 14 (Piling Method Statement),15 (Refuse and Recycling), 16 (Noise Mitigation Measures), 17 (Insultation Measures - commercial), 18 (Sound Level Rating - External Plant), 19 (Masts, Antennae & Satellite Dishes), 21 (Flood Risk Assessment), 25 (Business Hours), 26 (Commercial Units Use Class), 27 (Bat Survey Report), 28 (BREEAM), 29 (Energy Strategy), 31 (Dwelling Energy Performance Certificates), 32 (Commercial Spaces Energy Performance Certificates), 33 (Children's Play Space), 36 (Fire Statement) and 37 (Wind Assessment) and the inclusion of new conditions relating to sound insultation between residential units, fa�ade sound insultation measures and anti-vibration measures, pursuant to planning permission reference 171721FUL dated 02.02.2018 as varied by 203596NMA dated 17.09.2020 and pursuant to 213744VAR dated 08.12.2021 for 'Construction of buildings comprising residential units (Use Class C3), flexible retail space (Use Class A1/A2) (at ground floor of the building fronting Northfield Avenue), office space (Use Class B1) (at ground and lower ground of the building fronting Northfield Avenue), landscaping, access and servicing, car parking and associated works (following demolition of existing buildings).' Variation seeks four additional residential units; reduction in non-residential floorspace; decreasing the height of Block A (from 8 storeys to 6 storeys) and increasing the height of Block C from (from 3 and 4 storeys to 4 and 5 storeys); internal alterations to allow for sprinkler tank infrastructure; amendments to the car and cycle parking provision; other associated access and landscape works and varying the legal obligation.

Proposal details

Reference
262479VAR
Alternative references
PP-14989299
Ward
Northfield
Agent
Stantec UK Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Orion Park Northfield Avenue West Ealing W13 9SJ

This record has no verified map location.

View council map

Documents 84 of 84

DocumentPublishedAction
SWEPT PATH ANALYSISTransport Assessment · PDF1 Oct 2026View
AMENDMENTS COVERING LETTERSupporting Documentation · PDF26 Aug 2026View
PROPOSED BLOCK A ELEVATION SHEET 1Drawing · PDF26 Aug 2026View
PROPOSED BLOCK A UPPER GROUND FLOOR PLANSupporting Documentation · PDF26 Aug 2026View
PROPOSED BLOCK A LOWER GROUND FLOOR PLANDrawing · PDF26 Aug 2026View
UPDATED PILING METHOD STATEMENTSupporting Documentation · PDF7 Aug 2026View
UPDATED PILING METHOD STATEMENTSupporting Documentation · PDF30 Jul 2026View
CONSERVATION SITE NOTICESite Notice · PDF10 Jul 2026View
CONSERVATION SITE NOTICESite Notice · PDF10 Jul 2026View
CONSERVATION SITE NOTICESite Notice · PDF10 Jul 2026View
MAJOR SITE NOTICESite Notice · PDF10 Jul 2026View
262479VAR SM.PDFSite Notice · PDF10 Jul 2026View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-L-A-1100-ACCOMMODATION SCHEDULEDrawing · PDF19 Jun 2026View
ORP-HGP-AA-XX-D-A-3001-BLOCK A ELEVATIONS SHEET 2Drawing · PDF19 Jun 2026View
ORP-HGP-DD-XX-D-A-3005-BLOCK D ELEVATIONS SHEET 1Drawing · PDF19 Jun 2026View
ORP-HGP-DD-XX-D-A-3006-BLOCK D ELEVATIONS SHEET 2Drawing · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-D-A-3007-SITEWIDE ELEVATIONSDrawing · PDF19 Jun 2026View
ORP-HGP-DD-00-D-A-2002-BLOCK D GROUND FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-DD-01-D-A-2012-BLOCK D FIRST FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-DD-02-D-A-2022-BLOCK D SECOND FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-DD-03-D-A-2032-BLOCK D THIRD FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-DD-04-D-A-2042-BLOCK D FOURTH FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-AA-01-D-A-2010-BLOCK A FIRST FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-AA-02-D-A-2020-BLOCK A SECOND FLOOR PLANDrawing · PDF19 Jun 2026View
ORP-HGP-AA-03-D-A-2030-BLOCK A THIRD FLOOR PLANDraw - Prop Roof Plan · PDF19 Jun 2026View
ORP-HGP-AA-04-D-A-2040-BLOCK A FOURTH FLOOR PLANDraw - Prop Roof Plan · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-10001-DETAILED HARD LANDSCAPE PROPOSALS - 1 OF 4Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-10002-DETAILED HARD LANDSCAPE PROPOSALS - 2 OF 4Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-10003-DETAILED HARD LANDSCAPE PROPOSALS - 3 OF 4Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-10004-DETAILED HARD LANDSCAPE PROPOSALS - 4 OF 4Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-20001-DETAILED PLANTING PROPOSALS - 1 OF 2Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-00-D-L-20002-DETAILED PLANTING PROPOSALS - 2 OF 2Landscaping Details · PDF19 Jun 2026View
ORP-LIZ-ZZ-04-D-L-10005-DETAILED HARD LANDSCAPE PROPOSALS - 4TH FLOORLandscaping Details · PDF19 Jun 2026View
ORP-HGP-ZZ-00-D-A-7500-SITEWIDE REFUSE STRATEGYTransport Assessment · PDF19 Jun 2026View
ORP-HGP-AA-B1-D-A-7501-BLOCK A REFUSE STRATEGYSite Waste Management Plan · PDF19 Jun 2026View
ORP-HGP-DD-00-D-A-7503-BLOCK D REFUSE STRATEGYSite Waste Management Plan · PDF19 Jun 2026View
ORP-HGP-ZZ-06-D-A-1060-ROOF LEVEL SITE PLANDraw - Prop Roof Plan · PDF19 Jun 2026View
ORP-HGP-AA-05-D-A-2500-BLOCK A ROOF PLANDrawing · PDF19 Jun 2026View
ORP-HGP-DD-05-D-A-2502-BLOCK D ROOF PLANDrawing · PDF19 Jun 2026View
ORP-HGP-AA-XX-D-A-3500-BLOCK A SECTIONSDrawing · PDF19 Jun 2026View
ORP-HGP-BB-XX-D-A-3501-BLOCK B SECTIONSDrawing · PDF19 Jun 2026View
ORP-HGP-CC-XX-D-A-3502-BLOCK C SECTIONSDrawing · PDF19 Jun 2026View
ORP-HGP-DD-XX-D-A-3503-BLOCK D SECTIONSDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-D-A-3510-SITE SECTIONSDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-00-D-A-1000-LOWER GROUND - GROUND FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-01-D-A-1010-UPPER GROUND - FIRST FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-02-D-A-1020-SECOND FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-03-D-A-1030-THIRD FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-04-D-A-1040-FOURTH FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-HGP-ZZ-05-D-A-1050-FIFTH FLOOR SITE PLANDrawing · PDF19 Jun 2026View
ORP-OCS-XX-XX-D-C-500 - BELOW GROUND DRAINAGE PLANFlood Risk Assessment · PDF19 Jun 2026View
ORP-OCS-XX-XX-D-C-501 - BELOW GROUND DRAINAGE PLANFlood Risk Assessment · PDF19 Jun 2026View
ORP-STR-XX-XX-T-O-1004-DAYLIGHT SUNLIGHT ASSESSMENTDaylight Assessment · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART1Design and Access Statement · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART2Design and Access Statement · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART3Design and Access Statement · PDF19 Jun 2026View
ORP-HGP-ZZ-XX-T-A-9000-DESIGN AND ACCESS STATEMENT (ADDENDUM)_PART4Design and Access Statement · PDF19 Jun 2026View
H712-OCSC-LT-EK-01 - ORION PARK - DRAINAGE STATEMENT ADDENDUM_PART1Flood Risk Assessment · PDF19 Jun 2026View
H712-OCSC-LT-EK-01 - ORION PARK - DRAINAGE STATEMENT ADDENDUM_PART2Flood Risk Assessment · PDF19 Jun 2026View
ORP-TSL-XX-XX-T-O-1001-PRELIMINARY ECOLOGICAL APPRAISALDrawing · PDF19 Jun 2026View
ORP-STR-XX-XX-T-O-1003 - ENERGY STATMENT_RSustainability Appraisal · PDF19 Jun 2026View
ORP-BPTW-13-00-DR-A-0101-C01-A3Drawing · PDF19 Jun 2026View
ORP-BPTW-14-00-DR-A-0103-C01-A3Drawing · PDF19 Jun 2026View
ORP-BPTW-14-B1-DR-A-0102-C01-A3Drawing · PDF19 Jun 2026View
ORP-BPTW-14-ZZ-DR-A-2001-C01-A3Drawing · PDF19 Jun 2026View
ORP-STR-XX-XX-T-O-1002 - FACADE SOUND INSLUATION ASSESMENTNoise Impact Assessment · PDF19 Jun 2026View
ORP-AFF-XX-XX-T-O-8001-FIRE ADVICE NOTE_PART1Supporting Documentation · PDF19 Jun 2026View
ORP-AFF-XX-XX-T-O-8001-FIRE ADVICE NOTE_PART2Supporting Documentation · PDF19 Jun 2026View
ORP-AFF-XX-XX-T-O-8001-FIRE ADVICE NOTE_PART3Supporting Documentation · PDF19 Jun 2026View
ORP-AFF-XX-XX-T-O-9001-FIRE_STATEMENT_FORMSupporting Documentation · PDF19 Jun 2026View
H712-OCSC-LT-EK-02 - ORION PARK - FRA COMPLIANCE STATEMENTFlood Risk Assessment · PDF19 Jun 2026View
ORP-AMF-XX-XX-T-Z-0003-HEATING VENTILATION STRATEGYDrawing · PDF19 Jun 2026View
ORP-STR-XX-XX-T-O-1001 - OVERHEATING REPORTDrawing · PDF19 Jun 2026View
ORP-OCS-ZZ-FN-D-S-1100-S1-P01-BLOCK BC FOUNDATION PLANDrawing · PDF19 Jun 2026View
ORP-OCS-AA-FN-D-S-0999-S0-P02-BLOCK A PILING LAYOUTDraw - Exist Layout Plan · PDF19 Jun 2026View
ORP-OCS-AA-FN-D-S-1000-S0-P01-BLOCK A FOUNDATION PLANDrawing · PDF19 Jun 2026View
ORP-OCS-DD-FN-D-S-1199-S0-P02-BLOCK D PILING LAYOUTDrawing · PDF19 Jun 2026View
ORP-OCS-DD-FN-D-S-1200-S1-P02-BLOCK D FOUNDATION PLANDrawing · PDF19 Jun 2026View
ORP-OCS-ZZ-FN-D-S-1099-S0-P02-BLOCK BC PILING LAYOUTDraw - Exist Layout Plan · PDF19 Jun 2026View
ORP-MOD-XX-XX-T-H-0001- TRANSPORT ASSESSMENT ADDENDUMTransport Assessment · PDF19 Jun 2026View
SNG ORION PARK SCI - JUNE 2026Statement of Community Involvement · PDF19 Jun 2026View
260619 - AMENDMENTS COVERING LETTER (FINAL)Planning Statement · PDF19 Jun 2026View
260619 - ORION PARK - ADDENDUM PLANNING STATEMENT (FINAL APP)Planning Statement · PDF19 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.