Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Tetris Building Green Park Way Greenford UB6 0AD
Tetris Building Green Park Way Greenford UB6 0AD
This record has no verified map location.
View council mapInternal alterations including the removal of redundant ducting; the removal and replacement of flooring; the replacement of internal fire doors, doors and shutters; the removal of stud partitions and suspended ceiling fins; the removal of window blinds; the infilling of the void at ground floor slab, strip out of production area at first floor; the redecoration and painting, general repair and maintenance and other associated works; and the replacement of the external pedestrian door, replacement of external dock levellers and doors, and installation of a new fire exit (Listed Building Consent).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| OFFICERS REPORTOfficer Report · PDF | 8 May 2026 | View |
| DECISION NOTICEDecision · PDF | 8 May 2026 | View |
| PLAN - STRIP OUT WORKSSupporting Documentation · PDF | 1 May 2026 | View |
| LAMP POSTSite Notice · PDF | 12 Mar 2026 | View |
| CONSERVATION SITE NOTICESite Notice · PDF | 12 Mar 2026 | View |
| APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF | 6 Mar 2026 | View |
| TETRIS BUILDING - HERITAGE IMPACT ASSESSMENT - DIA IBMG.02Heritage Statement · PDF | 6 Mar 2026 | View |
| EXISTING DRAWINGSDraw - Exist Floor Plan · PDF | 6 Mar 2026 | View |
| 260303 DESIGN AND ACCESS STATEMENTDesign and Access Statement · PDF | 6 Mar 2026 | View |
| 129044-100-HLS-00-00-M2-G-11000-S0-P01 LOCATION PLANDraw - Location Plan · PDF | 6 Mar 2026 | View |
| 129044-100 - PROPOSED PLANSDrawing · PDF | 6 Mar 2026 | View |
| 129044-100 - PROPOSED ELEVATIONSDrawing · PDF | 6 Mar 2026 | View |
| SUPERCEDED - 129044-100 - PLANS (STRIP-OUT WORKS)Drawing · PDF | 6 Mar 2026 | View |
| 129044-100 - ELEVATIONS (STRIP-OUT WORKS)Drawing · PDF | 6 Mar 2026 | View |
| EXISTING DRAWINGS(PAGE01)Draw - Exist Floor Plan · PDF | 6 Mar 2026 | View |
| EXISTING DRAWINGS(PAGE02)Draw - Exist Floor Plan · PDF | 6 Mar 2026 | View |
| EXISTING DRAWINGS(PAGE03)Draw - Exist Floor Plan · PDF | 6 Mar 2026 | View |
| EXISTING DRAWINGS(PAGE04)Draw - Exist Floor Plan · PDF | 6 Mar 2026 | View |
| 129044-100 - PROPOSED PLANS(PAGE01)Drawing · PDF | 6 Mar 2026 | View |
| 129044-100 - PROPOSED PLANS(PAGE02)Drawing · PDF | 6 Mar 2026 | View |
| 129044-100 - PROPOSED PLANS(PAGE03)Drawing · PDF | 6 Mar 2026 | View |
| 129044-100 - PLANS (STRIP-OUT WORKS)(PAGE01)Drawing · PDF | 6 Mar 2026 | View |
| 129044-100 - PLANS (STRIP-OUT WORKS)(PAGE02)Drawing · PDF | 6 Mar 2026 | View |
| SUPERCEDED - 129044-100 - PLANS (STRIP-OUT WORKS)(PAGE03)Drawing · PDF | 6 Mar 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.