Council planning record

Alterations to fenestrations at lower ground (Flat A) and upper ground (Flat 1) floor level (Lawful Development Certificate for an Existing Use and Development)

116 The Grove Ealing W5 3SH

Permitted DevelopmentReference: 260681CPELondon Borough of Ealing

Application location

116 The Grove Ealing W5 3SH

This record has no verified map location.

View council map

Application summary

Status
Permitted Development
Application type
Certificate of Lawfulness - Existing
Received
17 Feb 2026
Validated
13 May 2026
Determination deadline
8 Jul 2026
Local authority
London Borough of Ealing

Application overview

Alterations to fenestrations at lower ground (Flat A) and upper ground (Flat 1) floor level (Lawful Development Certificate for an Existing Use and Development)

Proposal details

Reference
260681CPE
Alternative references
PP-14678666
Ward
Ealing Common
Agent
Savills (UK) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
OFFICERS REPORTOfficer Report · PDF2 Jul 2026View
DECISION NOTICEDecision · PDF2 Jul 2026View
CONSERVATION SITE NOTICESite Notice · PDF4 Jun 2026View
CONSERVATION SITE NOTICESite Notice · PDF13 May 2026View
SITE PLAN.PDFDrawing · PDF13 May 2026View
PRE-EXISTING DRAWINGS.PDFDrawing · PDF13 May 2026View
EXISTING - AS-BUILT - SIDE ELEVATION.PDFDrawing · PDF13 May 2026View
EXISTING - AS-BUILT - LGF UGF FLOOR PLAN.PDFDrawing · PDF13 May 2026View
EXISTING - AS-BUILT - F R ELEVATIONS.PDFDrawing · PDF13 May 2026View
CONSENTED PROPOSED DRAWING - SIDE ELEVATION.PDFDrawing · PDF13 May 2026View
CONSENTED PROPOSED DRAWING - F R ELEVATIONS.PDFDrawing · PDF13 May 2026View
CONSENTED PROPOSED DRAWING - LGF UGF FLOOR PLAN (003).PDFDrawing · PDF13 May 2026View
260681CPE SM.PDFSite Notice · PDF13 May 2026View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF17 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted Development
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.