Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

ApprovedReference: 254809HS2NMCLondon Borough of Ealing

Application location

North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
HIgh Speed 2
Received
22 Dec 2025
Validated
22 Dec 2025
Determination deadline
16 Feb 2026
Local authority
London Borough of Ealing

Application overview

Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound

Proposal details

Reference
254809HS2NMC
Alternative references
PP-14581075
Ward
Northolt Mandeville
Agent
SCS Railways Joint Venture

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
DECISION NOTICEDecision · PDF16 Feb 2026View
OFFICERS REPORTOfficer Report · PDF16 Feb 2026View
COVER LETTERCorrespondence · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
DrawingDrawing · PDF20 Jan 2026View
Draw - Exist Site/Block PlanDraw - Exist Site/Block Plan · PDF20 Jan 2026View
Supporting DocumentationSupporting Documentation · PDF20 Jan 2026View
Application Form - RedactedApplication Form - Redacted · PDF20 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.