Council planning record

Details of Fire Statement pursuant to condition 44 of planning permission ref: 232800FUL dated 08/05/2024 for: Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works

1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8D

ApprovedReference: 254791CNDLondon Borough of Ealing

Application location

1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8D

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
Discharge Condition
Received
11 Dec 2025
Validated
11 Dec 2025
Determination deadline
5 Feb 2026
Local authority
London Borough of Ealing

Application overview

Details of Fire Statement pursuant to condition 44 of planning permission ref: 232800FUL dated 08/05/2024 for: Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works

Proposal details

Reference
254791CND
Alternative references
PP-14556108
Ward
South Acton
Agent
Causeway Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
DECISION NOTICEDecision · PDF2 Feb 2026View
OFFICERS REPORTOfficer Report · PDF2 Feb 2026View
BOLLO LANE_EALING - DESIGN FIRE STRATEGY_BLOCK JK - DECEMBER 2025_PART2.Supporting Documentation · PDF22 Dec 2025View
BOLLO LANE_EALING - DESIGN FIRE STRATEGY_BLOCK JK - DECEMBER 2025_PART1.Supporting Documentation · PDF22 Dec 2025View
BOLLO LANE_EALING - DESIGN FIRE STRATEGY_BLOCK AB - DECEMBER 2025_PART3Supporting Documentation · PDF22 Dec 2025View
BOLLO LANE_EALING - DESIGN FIRE STRATEGY_BLOCK AB - DECEMBER 2025_PART2.Supporting Documentation · PDF22 Dec 2025View
BOLLO LANE_EALING - DESIGN FIRE STRATEGY_BLOCK AB - DECEMBER 2025_PART1.Supporting Documentation · PDF22 Dec 2025View
BOLLO LANE COVER LETTER FOR C43 AND C44.PDFCorrespondence · PDF22 Dec 2025View
APPLICATIONFORMREDACTEDApplication Form - Redacted · PDF22 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.