Council planning record

Confirmation of lawful implementation of planning permission 204654FUL dated 25.05.2022 for: Redevelopment of land at the rear of Nos 11 to 15 The Mall to provide a 9 storey building with basement, comprising 34 self-contained flats , (following part demolition of the existing extensions and structures to the rear of Nos. 11 to 15); Proposed E(b) Use (Restaurant) at basement; Existing E(b) Restaurant Use at ground floor of No. 13 The Mall to be extended into the rear of No. 12, change of use of ground floor of No. 12 The Mall from Retail to Residential (to form Entrance Lobby to Flats), to include alteration to front facade; alterations to existing air extract plant at Nos. 11, 12 and 13; bicycle, refuse and recycling stores (Part Retrospective).

11 - 15 The Mall Ealing W5 2PJ

Permitted DevelopmentReference: 254693CPELondon Borough of Ealing

Application location

11 - 15 The Mall Ealing W5 2PJ

This record has no verified map location.

View council map

Application summary

Status
Permitted Development
Application type
Certificate of Lawfulness - Existing
Received
12 Dec 2025
Validated
22 Dec 2025
Determination deadline
16 Feb 2026
Local authority
London Borough of Ealing

Application overview

Confirmation of lawful implementation of planning permission 204654FUL dated 25.05.2022 for: Redevelopment of land at the rear of Nos 11 to 15 The Mall to provide a 9 storey building with basement, comprising 34 self-contained flats , (following part demolition of the existing extensions and structures to the rear of Nos. 11 to 15); Proposed E(b) Use (Restaurant) at basement; Existing E(b) Restaurant Use at ground floor of No. 13 The Mall to be extended into the rear of No. 12, change of use of ground floor of No. 12 The Mall from Retail to Residential (to form Entrance Lobby to Flats), to include alteration to front facade; alterations to existing air extract plant at Nos. 11, 12 and 13; bicycle, refuse and recycling stores (Part Retrospective).

Proposal details

Reference
254693CPE
Ward
Ealing Broadway
Agent
Colony Architects Ltd.

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
DECISION NOTICEDecision · PDF26 Jan 2026View
OFFICERS REPORTOfficer Report · PDF26 Jan 2026View
STATUTORY DECLARATIONSupporting Documentation · PDF14 Jan 2026View
FENCING PHOTO 1Supporting Documentation14 Jan 2026View
FENCING PHOTO 2Supporting Documentation14 Jan 2026View
FENCING PHOTO 3Supporting Documentation14 Jan 2026View
WITNESS STATEMENTSupporting Documentation · PDF14 Jan 2026View
S106 CORRESPONDENCE WITH COUNCILSupporting Documentation14 Jan 2026View
DRAINAGE COMPLIANCE STATEMENTSupporting Documentation14 Jan 2026View
STATEMENT ON HOARDING WORKSSupporting Documentation14 Jan 2026View
FURTHER LDC INFORMATIONSupporting Documentation14 Jan 2026View
OBJECTIONCorrespondence5 Jan 2026View
CONSERVATION SITE NOTICESite Notice · PDF2 Jan 2026View
WITNESS STATEMENTSupporting Documentation · PDF2 Jan 2026View
DRAINAGE DESIGN PLANDrawing · PDF2 Jan 2026View
FENCING PHOTOGRAPH 1Supporting Documentation2 Jan 2026View
FENCING PHOTOGRAPH 2Supporting Documentation2 Jan 2026View
FENCING PHOTOGRAPH 3Supporting Documentation2 Jan 2026View
HOARDING MARKUP PLANDrawing · PDF2 Jan 2026View
PHOTOGRAPH OF HOARDING WORKSSupporting Documentation · PDF2 Jan 2026View
254693CPE SM.PDFDrawing · PDF2 Jan 2026View
DRAINAGE PHOTO 1Supporting Documentation22 Dec 2025View
DRAINAGE PHOTO 2Supporting Documentation22 Dec 2025View
DRAINAGE PHOTO 3Supporting Documentation22 Dec 2025View
DRAINAGE PHOTO 4Supporting Documentation22 Dec 2025View
LOCATION PLANDrawing · PDF22 Dec 2025View
LDC COVERING LETTER.Supporting Documentation · PDF12 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted Development
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.