Council planning record

Application for a Non-Material Amendment in (S96a) to planning permission 244581FUL dated 13.05.2025 for 'Construction of two storey, six bedroom dwellinghouse including roofspace accommodation (following demolition of existing building with retention of existing front facade); excavation of basement with recreational facilities, courtyard and sunken garden; incorporating rear terraces at first and second floor; restoration works to front elevation; installation of Air Source Heat Pumps within rear garden acoustic enclosure; and other associated works'. Amendment seeks to re-wording of condition 5 (Brick Panel)

14 Montpelier Road Ealing W5 2QP

ApprovedReference: 253652NMALondon Borough of Ealing

Last published check: 10 Oct 2026, 12:15. Check the council record for more recent changes.

Application location

14 Montpelier Road Ealing W5 2QP

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
Non-Material Amendment
Received
25 Sept 2025
Validated
25 Sept 2025
Determination deadline
22 Oct 2025
Local authority
London Borough of Ealing

Application overview

Application for a Non-Material Amendment in (S96a) to planning permission 244581FUL dated 13.05.2025 for 'Construction of two storey, six bedroom dwellinghouse including roofspace accommodation (following demolition of existing building with retention of existing front facade); excavation of basement with recreational facilities, courtyard and sunken garden; incorporating rear terraces at first and second floor; restoration works to front elevation; installation of Air Source Heat Pumps within rear garden acoustic enclosure; and other associated works'. Amendment seeks to re-wording of condition 5 (Brick Panel)

Proposal details

Reference
253652NMA
Alternative references
PP-14355911
Ward
Ealing Broadway
Agent
Olivia Fuller

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
DECISION NOTICEDecision · PDF9 Oct 2025View
OFFICERS REPORTOfficer Report · PDF9 Oct 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF25 Sept 2025View
COVER LETTERDrawing · PDF25 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.