Council planning record

Retrospective application for extensions and alterations at first floor level (Following part demolition of existing extension)

1a,1b,1c,1d,1e,1f,1g,1h,1i,1j Northcote Avenue Southall UB1 2AX

WithdrawnReference: 253513FULLondon Borough of Ealing

Application location

1a,1b,1c,1d,1e,1f,1g,1h,1i,1j Northcote Avenue Southall UB1 2AX

This record has no verified map location.

View council map

Application summary

Status
Withdrawn
Application type
Full Application
Received
16 Sept 2025
Validated
27 Nov 2025
Determination deadline
22 Jan 2026
Local authority
London Borough of Ealing

Application overview

Retrospective application for extensions and alterations at first floor level (Following part demolition of existing extension)

Proposal details

Reference
253513FUL
Alternative references
PP-14302299
Ward
Southall Broadway
Agent
MZA Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
NEIGHBOUR SITE NOTICESite Notice · PDF9 Dec 2025View
LAMPOST LOCATIONSSite Notice · PDF9 Dec 2025View
COVER LETTERCorrespondence · PDF1 Dec 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF16 Sept 2025View
BLOCK PLANDraw - Exist Site/Block Plan · PDF16 Sept 2025View
LOCATION PLANDraw - Location Plan · PDF16 Sept 2025View
PRE EXISTING GROUND FLR PRE EXTDraw - Exist Floor Plan · PDF16 Sept 2025View
FIRST FLOOR EXT (2)Draw - Exist Floor Plan · PDF16 Sept 2025View
EXT (3)Draw - Exist Roof Plan · PDF16 Sept 2025View
FRONT AND SIDE EXT (4)Draw - Exist Elevation (Front) · PDF16 Sept 2025View
REAR AND SIDE EXT (5)Draw - Exist Elevation (Rear) · PDF16 Sept 2025View
PRE EXISTING 1ST FLR PRE EXT (2)Draw - Exist Floor Plan · PDF16 Sept 2025View
PRE EXISTING PRE EXT (3)Draw - Exist Roof Plan · PDF16 Sept 2025View
PRE EXISTING FRONT-SIDE PRE EXT (4)Draw - Exist Elevation (Front) · PDF16 Sept 2025View
PRE EXISTING REAR-SIDE PRE EXT (5)Draw - Exist Elevation (Rear) · PDF16 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.