Council planning record

Details of the measures to reduce the C02 emissions associated with other energy uses (Phase 2) part pursuant to condition 36 (Part D only) of planning permission 203436VAR dated 23.12.2020 for 'Minor material amendment (S.73) to vary condition no.2 (approved plans) of planning permission reference 181990FUL, dated 09/12/2019, for 'Demolition of existing buildings and construction of part three, part six, part seven, part eight, part eleven, part twelve and part thirteen-storey development over basement with educational use (Class D1) at ground, first and second floors to accommodate a 6FE secondary school and residential use (Class C3) on upper levels containing 113 units (57 x 1 bed, 54 x 2 bed and 2 x 3 bed); construction of a two-storey residential building (use class C3) fronting Mill Hill Road containing three self-contained units (2 x 2 bed and 1 x 3 bed); and associated bin and cycle storage, hard and soft landscaping and boundary treatment work, sports hall, outdoor play space, new parking area and other associated works'. The amendment seeks permission to replace the eight units defined as Discounted Market Sale (DMS), with eight Discounted Market Rent (DMR) units.'

Ark Soane Academy Gunnersbury Lane Acton W3 8EA

ApprovedReference: 253322CNDLondon Borough of Ealing

Application location

Ark Soane Academy Gunnersbury Lane Acton W3 8EA

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
Discharge Condition
Received
1 Sept 2025
Validated
1 Sept 2025
Determination deadline
27 Oct 2025
Local authority
London Borough of Ealing

Application overview

Details of the measures to reduce the C02 emissions associated with other energy uses (Phase 2) part pursuant to condition 36 (Part D only) of planning permission 203436VAR dated 23.12.2020 for 'Minor material amendment (S.73) to vary condition no.2 (approved plans) of planning permission reference 181990FUL, dated 09/12/2019, for 'Demolition of existing buildings and construction of part three, part six, part seven, part eight, part eleven, part twelve and part thirteen-storey development over basement with educational use (Class D1) at ground, first and second floors to accommodate a 6FE secondary school and residential use (Class C3) on upper levels containing 113 units (57 x 1 bed, 54 x 2 bed and 2 x 3 bed); construction of a two-storey residential building (use class C3) fronting Mill Hill Road containing three self-contained units (2 x 2 bed and 1 x 3 bed); and associated bin and cycle storage, hard and soft landscaping and boundary treatment work, sports hall, outdoor play space, new parking area and other associated works'. The amendment seeks permission to replace the eight units defined as Discounted Market Sale (DMS), with eight Discounted Market Rent (DMR) units.'

Proposal details

Reference
253322CND
Alternative references
PP-14290885
Ward
South Acton
Agent
Jerram Falkus Construction Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
DECISION NOTICEDecision · PDF27 Oct 2025View
OFFICERS REPORTOfficer Report · PDF27 Oct 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF1 Sept 2025View
22-02-22 376 TABLE 1 - SHEDULE OF ELECTRIC VEHICAL CHARGING EQUIPMENTSupporting Documentation · PDF1 Sept 2025View
25-08-18 ARK SOANE PLANNING 36D RESICorrespondence · PDF1 Sept 2025View
ARK SOANE SECTION 2 APPLIANCES BLOCKS B. C. A AND THSupporting Documentation · PDF1 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.