Council planning record

Details of ground and airborne building vibration from railways, road traffic, industrial/commercial uses pursuant to condition 49 of planning permission ref: 243527VAR dated 26/06/2025 for: Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Clas

TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU

ApprovedReference: 253060CNDLondon Borough of Ealing

Last published check: 9 Oct 2026, 02:36. Check the council record for more recent changes.

Application location

TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU

This record has no verified map location.

View council map

Application summary

Status
Approved
Application type
Discharge Condition
Received
8 Aug 2025
Validated
8 Aug 2025
Determination deadline
3 Oct 2025
Local authority
London Borough of Ealing

Application overview

Details of ground and airborne building vibration from railways, road traffic, industrial/commercial uses pursuant to condition 49 of planning permission ref: 243527VAR dated 26/06/2025 for: Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Clas

Proposal details

Reference
253060CND
Alternative references
PP-14238831
Ward
South Acton
Agent
Carter Jonas

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
OFFICERS REPORTOfficer Report · PDF15 Sept 2025View
DECISION NOTICEDecision · PDF15 Sept 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF8 Aug 2025View
20250512-2408133-REP-04(7973719.1)Supporting Documentation · PDF8 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.