Council planning record

Single storey side/rear extension (following demolition of existing conservatory); alterations to rear elevations and fenestrations; installation of a rooflight to front roofslope; replacement windows to (front, rear and first floor, side elevation), replacement of existing front door and replacement front boundary wall

3 Fielding Road Chiswick W4 1HP

Granted with ConditionsReference: 252910HHLondon Borough of Ealing

Last published check: 9 Oct 2026, 13:04. Check the council record for more recent changes.

Application location

3 Fielding Road Chiswick W4 1HP

This record has no verified map location.

View council map

Application summary

Status
Granted with Conditions
Application type
Householder
Received
29 Jul 2025
Validated
29 Jul 2025
Determination deadline
23 Sept 2025
Local authority
London Borough of Ealing

Application overview

Single storey side/rear extension (following demolition of existing conservatory); alterations to rear elevations and fenestrations; installation of a rooflight to front roofslope; replacement windows to (front, rear and first floor, side elevation), replacement of existing front door and replacement front boundary wall

Proposal details

Reference
252910HH
Alternative references
PP-14198215
Ward
Southfield
Agent
MP - Design & Manage

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 39 of 39

DocumentPublishedAction
OFFICERS REPORTOfficer Report · PDF18 Dec 2025View
DECISION NOTICEDecision · PDF18 Dec 2025View
WINDOW DETAILS REV BDrawing · PDF17 Dec 2025View
REDLAND TECHNICAL DATA SHEETSupporting Documentation · PDF17 Dec 2025View
DESIGN CLARIFICATION AND SOLAR STUDY REV BSupporting Documentation · PDF10 Nov 2025View
REVISED PLANS REV DDrawing · PDF10 Nov 2025View
CONSERVATION SITE NOTICESite Notice · PDF12 Aug 2025View
252910HH SM.PDFSite Notice · PDF12 Aug 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF29 Jul 2025View
0018 - 05-01 - DEMOLITION FIRST FLOOR PLANDrawing · PDF29 Jul 2025View
0018 - 05-02 - DEMOLITION LOFT FLOOR PLANDrawing · PDF29 Jul 2025View
0018 - 05-03 - DEMOLITION ROOF PLANDrawing · PDF29 Jul 2025View
0018 - 05-20 - DEMOLITION SECTION A-ADrawing · PDF29 Jul 2025View
0018 - 05-22 - DEMOLITION SECTIONSDrawing · PDF29 Jul 2025View
0018 - 05-30 - DEMOLITION NORTH AND SOUTH ELEVATIONSDrawing · PDF29 Jul 2025View
0018 - 05-31 - DEMOLITION EAST ELEVATIONDrawing · PDF29 Jul 2025View
0018 - 05-00 - DEMOLITION GROUND FLOOR PLANDrawing · PDF29 Jul 2025View
0018 -02-02 - SITE PLANDrawing · PDF29 Jul 2025View
0018 -04-00 - EXISTING GROUND FLOOR PLANDrawing · PDF29 Jul 2025View
0018 -04-01 - EXISTING FIRST FLOOR PLANDrawing · PDF29 Jul 2025View
0018 -04-02 - EXISTING LOFT FLOOR PLANDrawing · PDF29 Jul 2025View
0018 -04-03 - EXISTING ROOF PLANDrawing · PDF29 Jul 2025View
0018 -04-20 - EXISTING SECTION A-ADrawing · PDF29 Jul 2025View
0018 -04-21 - EXISTING SECTION B-BDrawing · PDF29 Jul 2025View
0018 -04-22 - EXISTING SECTIONS C-C AND D-DDrawing · PDF29 Jul 2025View
0018 -04-30 - EXISTING NORTH AND SOUTH ELEVATIONSDrawing · PDF29 Jul 2025View
0018 -04-31 - EXISTING EAST ELEVATIONDrawing · PDF29 Jul 2025View
0018 -02-01 - LOCATION PLANDrawing · PDF29 Jul 2025View
0018 - 10-02 - PROPOSED LOFT FLOOR PLANDrawing · PDF29 Jul 2025View
0018 - 10-03 - PROPOSED ROOF PLANDrawing · PDF29 Jul 2025View
0018 - 10-20 - PROPOSED SECTION A-ADrawing · PDF29 Jul 2025View
0018 - 10-21 - PROPOSED SECTION B-BDrawing · PDF29 Jul 2025View
0018 - 10-22 - PROPOSED SECTIONS C-C AND D-DDrawing · PDF29 Jul 2025View
0018 - 10-30 - PROPOSED NORTH AND SOUTH ELEVATIONSDrawing · PDF29 Jul 2025View
0018 - 10-31 - PROPOSED EAST ELEVATIONDrawing · PDF29 Jul 2025View
0018 - 10-00 - PROPOSED GROUND FLOOR PLANDrawing · PDF29 Jul 2025View
0018 - 10-01 - PROPOSED FIRST FLOOR PLANDrawing · PDF29 Jul 2025View
0018 - 00-00 - DESIGN AND ACCESS STATEMENTDrawing · PDF29 Jul 2025View
0018 - 02-03 - PROPOSED SITE PLANDrawing · PDF29 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant with Conditions
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.