Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
130A Midhurst Road West Ealing W13 9TP
130A Midhurst Road West Ealing W13 9TP
This record has no verified map location.
View council mapApplication for a Non-Material Amendment (S96a) to planning permission ref: 241778HH dated 03/07/2024 (Alterations to the fenestration; replacement of windows; first-floor side/rear extension; alteration of roof to raise ridge height; rear roof extension incorporating a Juliet balcony, and installation of two roof lights to front roof slope) seeking to make alterations to proposed facades with alternative cladding materials, projecting brick piers to the front and rear facades, and integrating solar shading elements to the south. Alterations to the door, window, and rooflight arrangements. The subdivision of the loft bedroom into two bedrooms.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| OFFICERS REPORTOfficer Report · PDF | 30 Jul 2025 | View |
| DECISION NOTICEDecision · PDF | 30 Jul 2025 | View |
| APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF | 10 Jul 2025 | View |
| AD.110 PROPOSED SITE PLANDrawing · PDF | 10 Jul 2025 | View |
| AD.130 PROPOSED PLAN - LEVEL 00Draw - Prop Floor Plan · PDF | 10 Jul 2025 | View |
| AD.131 PROPOSED PLAN - LEVEL 01Draw - Prop Floor Plan · PDF | 10 Jul 2025 | View |
| AD.132 PROPOSED PLAN - LEVEL 02Draw - Prop Floor Plan · PDF | 10 Jul 2025 | View |
| AD.135 PROPOSED ROOF PLANDraw - Prop Roof Plan · PDF | 10 Jul 2025 | View |
| AD.260 PROPOSED ELEVATION - SOUTH WESTDraw - Prop Elevation (Rear) · PDF | 10 Jul 2025 | View |
| AD.270 PROPOSED ELEVATION - SOUTH EASTDrawing · PDF | 10 Jul 2025 | View |
| AD.280 PROPOSED ELEVATION - NORTH WESTDrawing · PDF | 10 Jul 2025 | View |
| AD.290 PROPOSED ELEVATION - NORTH EASTDraw - Prop Elevation (Front) · PDF | 10 Jul 2025 | View |
| AE.110 EXISTING SITE PLANDrawing · PDF | 10 Jul 2025 | View |
| AE.120 EXISTING PLAN - LEVEL 00Draw - Exist Floor Plan · PDF | 10 Jul 2025 | View |
| AE.121 EXISTING PLAN - LEVEL 01Draw - Exist Floor Plan · PDF | 10 Jul 2025 | View |
| AE.125 EXISTING ROOF PLANDraw - Exist Floor Plan · PDF | 10 Jul 2025 | View |
| AE.210 EXISTING ELEVATION - SOUTH WESTDraw - Exist Elevation (Rear) · PDF | 10 Jul 2025 | View |
| AE.220 EXISTING ELEVATION - SOUTH EASTDraw - Exist Elevation (Side) · PDF | 10 Jul 2025 | View |
| AE.230 EXISTING ELEVATION - NORTH WESTDrawing · PDF | 10 Jul 2025 | View |
| AE.240 EXISTING ELEVATION - NORTH EASTDrawing · PDF | 10 Jul 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.