Council planning record

Construction of two units of four bedroom detached dwellings (following demolition of existing garage)

7-9 Castlebar Hill Ealing W5 1TA

Granted with S106 conditionsReference: 252527FULLondon Borough of Ealing

Application location

7-9 Castlebar Hill Ealing W5 1TA

This record has no verified map location.

View council map

Application summary

Status
Granted with S106 conditions
Application type
Full Application
Received
27 Jun 2025
Validated
27 Jun 2025
Determination deadline
22 Aug 2025
Local authority
London Borough of Ealing

Application overview

Construction of two units of four bedroom detached dwellings (following demolition of existing garage)

Proposal details

Reference
252527FUL
Alternative references
PP-14073474
Ward
Ealing Broadway
Agent
Maven Plan Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
DRAFT DECISION NOTICEDecision · PDF26 Feb 2026View
FINAL DECISION NOTICEDecision · PDF26 Feb 2026View
S106 AGREEMENTLegal Documentation · PDF26 Feb 2026View
OFFICER REPORTOfficer Report · PDF6 Feb 2026View
OBJECTION LETTER - STONEHAM HOUSEComment - Public · PDF5 Aug 2025View
OBJECTION LETTER - LITTLE OAKSComment - Public · PDF5 Aug 2025View
CONSERVATION SITE NOTICESite Notice · PDF7 Jul 2025View
LAMP POSTSite Notice · PDF7 Jul 2025View
APPLICATIONFORMREDACTEDApplication Form - Without Personal Data · PDF27 Jun 2025View
VHN P25 03 EXISTING SITE PLAN 1_250Drawing · PDF27 Jun 2025View
VHN P25 04 PROPOSED SITE PLAN 1_250Drawing · PDF27 Jun 2025View
VHN P25 05 PROPOSED GROUND AND FIRST FLOOR PLANSDrawing · PDF27 Jun 2025View
VHN P25 06 PROPOSED SECOND FLOOR AND ROOF PLANSDrawing · PDF27 Jun 2025View
VHN P25 10 PERSPECTIVE VIEW FROM SOUTH EASTDrawing · PDF27 Jun 2025View
VHN P25 11 TYPICAL CROSS SECTIONDrawing · PDF27 Jun 2025View
HERITAGE STATEMENT-COMPRESSEDHeritage Statement · PDF27 Jun 2025View
ARBORICULTURAL IMPACT ASSESSMENTTree Survey · PDF27 Jun 2025View
DRAINAGE STRATEGYFlood Risk Assessment · PDF27 Jun 2025View
ECOLOGY AND BIODIVERSITY NET GAIN ASSESSMENTBiodiversity Report · PDF27 Jun 2025View
SUSTAINABILITY AND ENERGY STATEMENT 25TH JUN 2025 - COMPLETESustainability Appraisal · PDF27 Jun 2025View
PLANNING DESIGN AND ACCESS STATEMENTDesign and Access Statement · PDF27 Jun 2025View
VHN P25 01 LOCATION PLAN 1_1250(AUTOROTATED)Draw - Location Plan · PDF27 Jun 2025View
VHN P25 02 EXISTING SITE PLAN 1_500(AUTOROTATED)Drawing · PDF27 Jun 2025View
VHN P25 07 PLOTS 1 AND 2 PROPOSED NORTH AND SOUTH ELEVATIONS(AUTOROTATED)Drawing · PDF27 Jun 2025View
VHN P25 08 PLOT 1 PROPOSED EAST AND WEST ELEVATIONS(AUTOROTATED)Drawing · PDF27 Jun 2025View
VHN P25 09 PLOT 2 PROPOSED EAST AND WEST ELEVATIONS(AUTOROTATED)Drawing · PDF27 Jun 2025View
VHN P25 12 STREETSCENE ELEVATION TO THE KNOLL(AUTOROTATED)Drawing · PDF27 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant with S106 Obligations
DRAFT DECISION NOTICE FINAL DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.