erection of a single storey outbuildingThe structure will be positioned within the rear garden of the property, behind the principal elevation of the dwellinghouse. It will be constructed on a level base finished with timber decking or paving stones and will not involve the creation or alteration of any vehicular or pedestrian access, new streets, or significant hardstanding.External materials will comprise timber cladding with a flat roof finished in EPDM or similar. Surface water will drain naturally within the garden.The building will be used for domestic purposes incidental to the enjoyment of the dwellinghouse (e.g. home office / gym / studio).
erection of a single storey outbuildingThe structure will be positioned within the rear garden of the property, behind the principal elevation of the dwellinghouse. It will be constructed on a level base finished with timber decking or paving stones and will not involve the creation or alteration of any vehicular or pedestrian access, new streets, or significant hardstanding.External materials will comprise timber cladding with a flat roof finished in EPDM or similar. Surface water will drain naturally within the garden.The building will be used for domestic purposes incidental to the enjoyment of the dwellinghouse (e.g. home office / gym / studio).
Reference
25/03546/LP
Alternative references
PP-14446945
Ward
South Norwood
Agent
Acro Builds Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.