Council planning record

Hybrid planning application for the demolition of existing buildings (except 1-87 Regina Road) and phased mixed-use development for the provision of nine blocks of 3 to 6 storeys (Blocks A, part of B, C, E, F, G.1, G.2, H and I), one block which is up to 6 storeys (Block J (part)), one block which is in part up to 6 storeys and in part up to 14 storeys (Block J (part)), three 2 storey dwellinghouses (Block D) and two 3 storey dwellinghouses (part of Block B) containing up to 340 residential units comprisingFull application for all demolition (including 1-4 Sunny Bank, within the boundary of the Outline application) and the construction of nine blocks and five dwellinghouses (Blocks A to I) containing 225 residential units (Class C3), a pre-school (Class E(f)), a community space (Class F2), a Multi-use Games Area and associated public realm, landscaping, play space, refuse/recycling, car and cycle parking facilities and other associated worksOutline application for the construction of two blocks (Blocks J) of up to 115 residential units (Class C3) and associated public realm, landscaping, refuse/recycling, cycle parking facilities and other associated works with all matters reserved.

Regina Road Estate Regina Road And Sunny Bank South Norwood London SE25 4TT

DecidedReference: 25/02016/OUTLondon Borough of Croydon

Application location

Regina Road Estate Regina Road And Sunny Bank South Norwood London SE25 4TT

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Outline planning permission
Received
18 Jun 2025
Validated
24 Jun 2025
Determination deadline
23 Sept 2025
Local authority
London Borough of Croydon

Application overview

Hybrid planning application for the demolition of existing buildings (except 1-87 Regina Road) and phased mixed-use development for the provision of nine blocks of 3 to 6 storeys (Blocks A, part of B, C, E, F, G.1, G.2, H and I), one block which is up to 6 storeys (Block J (part)), one block which is in part up to 6 storeys and in part up to 14 storeys (Block J (part)), three 2 storey dwellinghouses (Block D) and two 3 storey dwellinghouses (part of Block B) containing up to 340 residential units comprisingFull application for all demolition (including 1-4 Sunny Bank, within the boundary of the Outline application) and the construction of nine blocks and five dwellinghouses (Blocks A to I) containing 225 residential units (Class C3), a pre-school (Class E(f)), a community space (Class F2), a Multi-use Games Area and associated public realm, landscaping, play space, refuse/recycling, car and cycle parking facilities and other associated worksOutline application for the construction of two blocks (Blocks J) of up to 115 residential units (Class C3) and associated public realm, landscaping, refuse/recycling, cycle parking facilities and other associated works with all matters reserved.

Proposal details

Reference
25/02016/OUT
Alternative references
PP-14019735
Ward
South Norwood
Agent
Karen Jones

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 400 of 400

DocumentPublishedAction
GRANTED (106G) OUTLINE - DEC NOTICEDecision Notice(s) · PDF12 Jan 2026View
OFFICER REPORT WEB - FINALOfficers Report Final · PDF12 Jan 2026View
UNILATERAL UNDERTAKING - REDACTED106 Public · PDF30 Dec 2025View
RRM-BPTW-S01-00-SK-A-0121-P05-S3 - DEMOLITION PLAN TO ENABLE WORKS.PDFRevised Drawing · PDF8 Dec 2025View
RRM-BPTW-S01-00-SK-A-0120-P02-S3 - PHASING PLAN.PDFRevised Drawing · PDF8 Dec 2025View
RRM-BPTW-S01-00-SK-A-0119-P02-S3 - PHASE 1 NORTH & SOUTH.PDFRevised Drawing · PDF8 Dec 2025View
REGINA RD ESTATE - FVA - RESPONSE TO BNP & GLA REVIEW_SEP 25.PDFOther · PDF13 Oct 2025View
REGINA ESTATE VIABILITY REVIEWOther · PDF9 Oct 2025View
834-FH-XX-00-DP-L-203 BOUNDARIES PLAN.PDFRevised Drawing · PDF9 Oct 2025View
834-FH REGINA ROAD LANDSCAPE ADDENDUM.PDFOther · PDF9 Oct 2025View
ITEM 1 REGINA ROAD ESTATE, REGINA ROAD AND SUNNY BANK, SOUTH NORWOODOfficers Report Final · PDF7 Oct 2025View
REGINA ROAD SEC COMPLETION NARRATION (30.09.25) REV.8.PDFReport · PDF2 Oct 2025View
24149-XX-MA-DR-C-SK04 - PROPOSED ON-STREET PUBLIC P04 UPDATED_COMPRESSED.PDFDrawing · PDF2 Oct 2025View
24149-XX-MA-DR-C-SK02 - PROPOSED OFF-STREET PRIVATE P04 UPDATED_COMPRESSED.PDFRevised Drawing · PDF2 Oct 2025View
RRM-BPTW-BG-ZZ-DR-A-2001-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-ZZ-DR-A-2000-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-04-DR-A-1005-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-04-DR-A-1004-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-03-DR-A-1003-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-03-DR-A-1003-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-03-DR-A-1003-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BG-03-DR-A-1003-C03-A3.PDFRevised Drawing · PDF22 Sept 2025View
LOW RES D&ARevised Drawing · PDF22 Sept 2025View
D &A PART 1Revised Drawing · PDF22 Sept 2025View
D &A PART 1Revised Drawing · PDF22 Sept 2025View
D &A PART 2Revised Drawing · PDF22 Sept 2025View
D &A PART 3Revised Drawing · PDF22 Sept 2025View
D &A PART 4Revised Drawing · PDF22 Sept 2025View
D &A PART 6Revised Drawing · PDF22 Sept 2025View
D &A PART 7Revised Drawing · PDF22 Sept 2025View
D &A PART 8Revised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-00-DR-A-0600-C04-A3 - PROPOSED GROUND FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-01-DR-A-0601-C04-A3 - PROPOSED FIRST FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-02-DR-A-0602-C04-A3 - PROPOSED SECOND FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-03-DR-A-0603-C04-A3 - PROPOSED THIRD FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-04-DR-A-0604-C04-A3 - PROPOSED FOURTH FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-05-DR-A-0605-C04-A3 - PROPOSED FIFTH FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-S01-06-DR-A-0606-C04-A3 - PROPOSED SIXTH FLOOR SITE PLAN.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-BD-ZZ-DR-SK-A-C01-A3 - GENERATOR & PERGOLA PLAN.PDFRevised Drawing · PDF22 Sept 2025View
24149-MA-DR-TN09 - WASTE STRATEGY ADDENDUM.PDFRevised Drawing · PDF22 Sept 2025View
RRM-BPTW-XX-XX-SA-A-0806-C04-A3 - PLOT SCHEDULE.PDFRevised Drawing · PDF15 Sept 2025View
RRM-BPTW-XX-XX-SA-A-0805-C04-A3 - ACCOMMODATION SUMMARY.PDFRevised Drawing · PDF15 Sept 2025View
D&A ADDENDUMRevised Drawing · PDF15 Sept 2025View
D&A ADDENDUMRevised Drawing · PDF15 Sept 2025View
REVISED DESIGN AND ACCESSRevised Drawing · PDF15 Sept 2025View
DESIGN CODERevised Drawing · PDF15 Sept 2025View
RRM-BPTW-S01-ZZ-DR-A-1001-C02-A3.PDF _ PERIMETER PLANRevised Drawing · PDF15 Sept 2025View
RRM-BPTW-S01-ZZ-DR-A-2000-C02-A3 SHEET 1 OF 3.PDF CONTEXT ELEVATIONS 1Revised Drawing · PDF15 Sept 2025View
RRM-BPTW-S01-ZZ-DR-A-2000-C02-A3 SHEET 1 OF 3.PDF CONTEXT ELEVATIONS 2Revised Drawing · PDF15 Sept 2025View
RRM-BPTW-S01-ZZ-DR-A-2000-C02-A3 SHEET 1 OF 3.PDF CONTEXT ELEVATIONS 3Revised Drawing · PDF15 Sept 2025View
BLOCK A ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK A ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK B ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK B ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK C ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK D ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK E ELEVATIONSRevised Drawing15 Sept 2025View
BLOCK E ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK F ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK F ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK G ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK G ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK H ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK I ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK I ELEVATIONSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK A FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK B FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK C FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK C FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK C FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK C FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK C FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK D FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK E FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK F FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK G FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK H FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK H FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK H FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK H FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK H FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
BLOCK I FLOOR PLANSRevised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 1Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 2Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 3Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 4Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 4Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLANS 5Revised Drawing · PDF15 Sept 2025View
PROPOSED SITE PLAN 6Revised Drawing · PDF15 Sept 2025View
RRM-BPTW-S01-ZZ-DR-A-2201-C02-A3 LOW RES.PDFRevised Drawing · PDF15 Sept 2025View
PLANNING AMENDMENTS SUMMARYRevised Drawing · PDF15 Sept 2025View
6651_02C_BNG REPORT_DESIGN STAGE_ISSUE.PDFRevised Drawing · PDF15 Sept 2025View
BNG SPREADSHEETRevised Drawing15 Sept 2025View
DAYLIGHT AND SUNLIGHT INTERNALRevised Drawing · PDF15 Sept 2025View
BB7 LPFS REGINA ROAD ESTATE REV 03 (2025 09 12).PDFRevised Drawing · PDF15 Sept 2025View
16970BC-BB7-ZZ-ZZ-SG-Y-1001-P02.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-601 FURNITURE AND LANDSCAPE ELEMENTS.PDFRevised Drawing15 Sept 2025View
834-FH-XX-00-DP-L-601 FURNITURE AND LANDSCAPE ELEMENTS.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-402 TREE PLAN.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-401 SOFT LANDSCAPE PLAN.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-301 LEVELS & DRAINAGE STRATEGY PLAN.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-203 BOUNDARIES PLAN.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-201 HARD LANDSCAPE PLAN.PDF 1.33Revised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-102 UGF.PDFRevised Drawing · PDF15 Sept 2025View
834-FH-XX-00-DP-L-101 GENERAL ARRANGEMENT.PDFRevised Drawing · PDF15 Sept 2025View
834-FH REGINA ROAD LANDSCAPE ADDENDUM.PDF 6.75Revised Drawing · PDF15 Sept 2025View
COVER LETTER TO REVISIONSRevised Drawing · PDF15 Sept 2025View
RRE-SDP-ZZ-00-DR-ME-05100.PDFRevised Drawing · PDF5 Sept 2025View
M&ERevised Drawing · PDF5 Sept 2025View
20250729 REGINA ROAD ESTATE - GLA CONSULTATION (POST STAGE 1 SET 1) - ENERGY MEMRevised Drawing5 Sept 2025View
TFL DETAILED CONSULTATION RESPONSE 08082025.PDFOther · PDF2 Sept 2025View
TRANSPORT NOTE UPDATERevised Drawing · PDF2 Sept 2025View
10075-SP-GLA WLC SPREADSHEET-P01-250723.XLSXAdditional Plans / Correspondence24 Jul 2025View
10075-SP-GLA CIRCULAR ECONOMY SPREADSHEET- P01-250626_2ND_PHASE APPLICATION.XLSMAdditional Plans / Correspondence24 Jul 2025View
10075-SP-GLA CIRCULAR ECONOMY SPREADSHEET- P01-250626_1ST_PHASE APPLICATION.XLSMAdditional Plans / Correspondence24 Jul 2025View
10075-RP-CIRCULAR ECONOMY STATEMENT-P01-250626.PDFAdditional Plans / Correspondence · PDF24 Jul 2025View
10.075-RP-WHOLE LIFE CYCLE CARBON ASSESSMENT-D01-250723.PDFAdditional Plans / Correspondence · PDF24 Jul 2025View
REVISED DESIGN AND ACCESS STATEMENT PART 1Revised Drawing · PDF3 Jul 2025View
SITE NOTICE NEIGHBOUR NOTIFICATIONSite Notices · PDF25 Jun 2025View
FINANCIAL VIABILITY ASSESSMENTStatements / Assessments · PDF24 Jun 2025View
LIST OF SUBMISSION DOCUMENTSApplication Submission details · PDF19 Jun 2025View
FARRER HUXLEY DRAWINGS INDEXApplication Submission details · PDF19 Jun 2025View
CIVIL AND STRUCTURAL STAGE 3 REPORTReport · PDF19 Jun 2025View
CARBON EMMISSION SPREADSHEETApplication Submission details19 Jun 2025View
BPTW DRAWING ISSUE SHEET SITE LAYOUTApplication Submission details · PDF19 Jun 2025View
PLANNING STATEMENTStatements / Assessments · PDF19 Jun 2025View
CARBON EMISSION REPORTING SPREADSHEETApplication Submission details19 Jun 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF18 Jun 2025View
ARCHAEOLOGICAL ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
THE LOCATION PLANDrawing · PDF18 Jun 2025View
BLOCK PLAN OF THE SITEDrawing · PDF18 Jun 2025View
SITE DEMOLITION PLANDrawing · PDF18 Jun 2025View
SITE/BLOCK PLAN - EXISTINGDrawing · PDF18 Jun 2025View
PROPOSED GROUND FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED FIRST FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED SECOND FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED THIRD FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED FOURTH FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED FIFTH FLOOR SITE PLANDrawing · PDF18 Jun 2025View
PROPOSED SIXTH FLOOR SITE PLANDrawing · PDF18 Jun 2025View
1-8B SUNNY BANK FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
1-8B SUNNY BANK SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
1-8B SUNNY BANK GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD FIFTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD SIXTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD SEVENTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD EIGTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD NINTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD TENTH FLOOR PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD ELEVENTH FLOOR / PLANT ROOM PLANDrawing · PDF18 Jun 2025View
1-87 REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD FIFTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD SIXTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD 7TH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD EIGTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD NINTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD TENTH FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD ELEVENTH FLOOR / PLANT ROOM PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD BASEMENT FLOOR PLANDrawing · PDF18 Jun 2025View
2-56 REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD FIFTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD SIXTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD SEVENTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD EIGTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD NINTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD TENTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD ELEVENTH FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD BASEMENT FLOOR PLANDrawing · PDF18 Jun 2025View
58-108 REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
89-123 REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
89-123 REGINA ROAD SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
89-123 REGINA ROAD THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
89-123 REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
110A REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
110A REGINA ROAD SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
110A REGINA ROAD THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
110A REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
110 REGINA ROAD - PORTLAND BILL PRE-SCHOOL GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
112-128 REGINA ROAD FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
12-128 REGINA ROAD GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
ROOF PLANSDrawing · PDF18 Jun 2025View
FLAT BLOCK A - GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A - FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A - SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A - THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A -FIFTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK A - ROOF PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B - FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B -SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B - THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK B - ROOF PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK C -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK C - FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK C - SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK C -THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK C -ROOF PLANDrawing · PDF18 Jun 2025View
HOUSES BLOCK D -GROUND, FIRST & ROOF FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E -FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E - SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E - THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E - FIFTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK E - ROOF PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F - FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F -SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F -THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK F -ROOF PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G - GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G -FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G -SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G -THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK G -ROOF PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK H -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK H -FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK H -SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK H -THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
FLAT BLOCK H -ROOF PLANDrawing · PDF18 Jun 2025View
BLOCK I -GROUND FLOOR PLANDrawing · PDF18 Jun 2025View
BLOCK I -FIRST FLOOR PLANDrawing · PDF18 Jun 2025View
BLOCK I -SECOND FLOOR PLANDrawing · PDF18 Jun 2025View
BLOCK I -THIRD FLOOR PLANDrawing · PDF18 Jun 2025View
BLOCK I -FOURTH FLOOR PLANDrawing · PDF18 Jun 2025View
BLOCK I -ROOF PLANDrawing · PDF18 Jun 2025View
ELEVATION (FRONT) - EXISTINGDrawing · PDF18 Jun 2025View
FLAT BLOCK A -ELEVATIONS -SHEET 1 OF 2Drawing · PDF18 Jun 2025View
FLAT BLOCK A -ELEVATIONS -SHEET 2 OF 2Drawing · PDF18 Jun 2025View
FLAT BLOCK B -ELEVATIONSDrawing · PDF18 Jun 2025View
FLAT BLOCK B -ELEVATIONS - SHEET 2 OF 2Drawing · PDF18 Jun 2025View
FLAT BLOCK C -ELEVATIONSDrawing · PDF18 Jun 2025View
HOUSES BLOCK D -ELEVATIONSDrawing · PDF18 Jun 2025View
BLOCK E ELEVATIONSDrawing · PDF18 Jun 2025View
BLOCK F NORTH AND SOUTH ELEVATIONSDrawing · PDF18 Jun 2025View
BLOCK F EAST AND WEST ELEVATIONSDrawing · PDF18 Jun 2025View
BLOCK G.1 ELEVATIONSDrawing · PDF18 Jun 2025View
FLAT BLOCK G.2 -ELEVATIONSDrawing · PDF18 Jun 2025View
BLOCK H ELEVATIONSDrawing · PDF18 Jun 2025View
FLAT BLOCK I -ELEVATIONSDrawing · PDF18 Jun 2025View
FLAT BLOCK I -SIDE ELEVATIONSDrawing · PDF18 Jun 2025View
PROPOSED SITE SECTIONSDrawing · PDF18 Jun 2025View
SECTION - EXISTINGDrawing · PDF18 Jun 2025View
PROPOSED STREET ELEVATIONS - SHEET 1 OF 3Drawing · PDF18 Jun 2025View
PROPOSED STREET ELEVATIONS - SHEET 2 OF 3Drawing · PDF18 Jun 2025View
PROPOSED STREET ELEVATIONS - SHEET 3 OF 3Drawing · PDF18 Jun 2025View
ACCOMMODATION SUMMARYStatements / Assessments · PDF18 Jun 2025View
PLOT SCHEDULEStatements / Assessments · PDF18 Jun 2025View
SITE TOPOGRAPHY SURVEYDrawing · PDF18 Jun 2025View
REGINA ROAD LIGHTING STRATEGYStatements / Assessments · PDF18 Jun 2025View
SUPERSEDED - DESIGN AND ACCESS STATEMENT 1 OF 5Statements / Assessments · PDF18 Jun 2025View
DESIGN AND ACCESS STATEMENT 2 OF 5Statements / Assessments · PDF18 Jun 2025View
DESIGN AND ACCESS STATEMENT 3 OF 5Statements / Assessments · PDF18 Jun 2025View
DESIGN AND ACCESS STATEMENT 4 OF 5Statements / Assessments · PDF18 Jun 2025View
DESIGN AND ACCESS STATEMENT 5 OF 5Statements / Assessments · PDF18 Jun 2025View
REGINA ROAD DESIGN CODEStatements / Assessments · PDF18 Jun 2025View
PARAMETER PLAN - MAXIMUM HEIGHTDrawing · PDF18 Jun 2025View
PARAMETER PLAN - SITE LAYOUTDrawing · PDF18 Jun 2025View
PARAMETER PLAN - OPEN SPACEDrawing · PDF18 Jun 2025View
PARAMETER PLAN - ACCESS & MOVEMENTDrawing · PDF18 Jun 2025View
PARAMETER PLAN - LAND USEDrawing · PDF18 Jun 2025View
REGINA ROAD EXISTING SITE CONDITIONSStatements / Assessments · PDF18 Jun 2025View
REGINA ROAD COMMUNITY FACILITIES STATEMENTStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT AND SUNLIGHT APPENDICESStatements / Assessments · PDF18 Jun 2025View
2. TABULATED DAYLIGHT AND SUNLIGHT RESULTS - APPENDIX AStatements / Assessments · PDF18 Jun 2025View
ANNUAL PROBABLE SUNLIGHT HOURSStatements / Assessments · PDF18 Jun 2025View
3. DAYLIGHT DISTRIBUTION CONTOUR PLANS - APPENDIX AStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
4. SUN HOURS ON GROUND (OVERSHADOWING) PLANS - APPENDIX AStatements / Assessments · PDF18 Jun 2025View
1. PLAN AND 3D VIEWS OF COMPUTER MODEL - APPENDIX BDrawing · PDF18 Jun 2025View
2. TABULATED DAYLIGHT AND SUNLIGHT RESULTS - APPENDIX BStatements / Assessments · PDF18 Jun 2025View
ANNUAL PROBABLE SUNLIGHT HOURS (APSH)SStatements / Assessments · PDF18 Jun 2025View
3. DAYLIGHT DISTRIBUTION CONTOUR PLANS - APPENDIX BStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
DAYLIGHT DISTRIBUTION CONTOURSDrawing · PDF18 Jun 2025View
4. SUN HOURS ON GROUND (OVERSHADOWING) PLANS - APPENDIX BStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT AND SUNLIGHT REPORTStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT AND SUNLIGHT APPENDICESStatements / Assessments · PDF18 Jun 2025View
DAYLIGHT ILLUMINANCE TABLE APPENDIX BStatements / Assessments · PDF18 Jun 2025View
SUNLIGHT EXPOSURE TABLE APPENDIX CStatements / Assessments · PDF18 Jun 2025View
LAYOUT PLANS WITH DAYLIGHT ILLUMINANCE RESULTS APPENDIX DStatements / Assessments · PDF18 Jun 2025View
TARGET ILLUMINANCE - INTERNAL FLOOR LAYOUTSDrawing · PDF18 Jun 2025View
TARGET ILLUMINANCE - INTERNAL FLOOR LAYOUTSDrawing · PDF18 Jun 2025View
VSC AND APSH FA�ADE STUDY SCREENSHOTS APPENDIX EDrawing · PDF18 Jun 2025View
TWO-HOURS SUN CONTOUR PLANS APPENDIX FStatements / Assessments · PDF18 Jun 2025View
LIGHT WITHIN REPORTStatements / Assessments · PDF18 Jun 2025View
PRELIMINARY ECOLOGICAL APPRAISALStatements / Assessments · PDF18 Jun 2025View
BIODIVERSITY GAIN PLANStatements / Assessments · PDF18 Jun 2025View
EQUALITIES IMPACT ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
LONDON PLAN FIRE STATEMENTStatements / Assessments · PDF18 Jun 2025View
PLANNING GATEWAY ONE FIRE STATEMENTStatements / Assessments · PDF18 Jun 2025View
FLOOD RISK ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
DRAINAGE DOCUMENTATIONStatements / Assessments · PDF18 Jun 2025View
HEALTH IMPACT ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 1 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 2 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 3 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 4 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 5 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 6 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 7 OF 8Statements / Assessments · PDF18 Jun 2025View
HERITAGE STATEMENT 8 OF 8Statements / Assessments · PDF18 Jun 2025View
AIR QUALITY ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
WHOLE LIFE CYCLE CARBON ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
CIRCULAR ECONOMY STATEMENTStatements / Assessments · PDF18 Jun 2025View
ENERGY STATEMENTStatements / Assessments · PDF18 Jun 2025View
SUSTAINABILITY STATEMENTStatements / Assessments · PDF18 Jun 2025View
GENERAL ARRANGEMENT PLANDrawing · PDF18 Jun 2025View
URBAN GREENING FACTOR PLANDrawing · PDF18 Jun 2025View
HARD LANDSCAPE PLANDrawing · PDF18 Jun 2025View
LEVELS AND DRAINAGEDrawing · PDF18 Jun 2025View
SOFT LANDSCAPE PLANDrawing · PDF18 Jun 2025View
TREE PLANDrawing · PDF18 Jun 2025View
FURNITURE AND LANDSCAPE ELEMENTSDrawing · PDF18 Jun 2025View
LANDSCAPING DETAILS 1 OF 3Statements / Assessments · PDF18 Jun 2025View
LANDSCAPING DETAILS 2 OF 3Statements / Assessments · PDF18 Jun 2025View
LANDSCAPING DETAILS 3 OF 3Statements / Assessments · PDF18 Jun 2025View
REGINA ROAD ESTATE WIND MICROCLIMATE ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
ENVIRONMENTAL NOISE ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
STATEMENT OF COMMUNITY INVOLVEMENTStatements / Assessments · PDF18 Jun 2025View
TELECOMS SUPPLEMENTARY INFOStatements / Assessments · PDF18 Jun 2025View
ARBORICULTURAL IMPACT ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
LAND CONTAMINATION ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
LAND CONTAMINATION ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
LAND CONTAMINATION ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
SECTIONAL DELIVERY PLANDrawing · PDF18 Jun 2025View
APPENDICES A, B AND CStatements / Assessments · PDF18 Jun 2025View
FIGURES 1.1 TO 5.8Drawing · PDF18 Jun 2025View
INDICATIVE DEMOLITION STAGING - HARD LANDSCAPE PLANDrawing · PDF18 Jun 2025View
CONSTRUCTION LAYOUT 3 OF 5 - CONSTRUCTION STAGE 1Drawing · PDF18 Jun 2025View
FRAMEWORK CONSTUCTION LOGISTICS PLANStatements / Assessments · PDF18 Jun 2025View
APPENDIX A ? PROPOSED SITE LAYOUTDrawing · PDF18 Jun 2025View
DRAWINGSDrawing · PDF18 Jun 2025View
DELIVERY, SERVICING AND WASTE PLANStatements / Assessments · PDF18 Jun 2025View
APPENDICES A, B, C, D AND EStatements / Assessments · PDF18 Jun 2025View
DRAWINGSDrawing · PDF18 Jun 2025View
PLANSDrawing · PDF18 Jun 2025View
FIGURES 1.1 - 4.17Drawing · PDF18 Jun 2025View
LOCAL FACILITIESDrawing · PDF18 Jun 2025View
ATZ FOR AUDITDrawing · PDF18 Jun 2025View
TRANSPORT ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
TRANSPORT ASSESSMENTStatements / Assessments · PDF18 Jun 2025View
FRAMEWORK RESIDENTIAL TRAVEL PLANStatements / Assessments · PDF18 Jun 2025View
SITE CONTENT - LOCAL FACILITIESDrawing · PDF18 Jun 2025View
ACTIVE TRAVL NETWORK - PUBLIC TRANSPORT PLANDrawing · PDF18 Jun 2025View
APPENDICES A, B AND CStatements / Assessments · PDF18 Jun 2025View
COVERING LETTERBackGround Papers · PDF18 Jun 2025View
NOTICES HAVE BEEN SENT TO BOTH PROPERTY AND POSTAL ADDRESSESStatements / Assessments · PDF18 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Standard Consultation Date

    Published milestoneCouncil source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  10. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Actual Committee Date

    Published milestoneCouncil source
  12. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source
  15. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

P. Granted with 106 legal Ag. (3 months)
GRANTED (106G) OUTLINE - DEC NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.