Council planning record

Alteration of roof from hipped to gable end. Erection of part single-storey, part two-storey rear extension incorporating two rear dormers. Installation of four windows to ground floor front elevation. Installation of two dormer windows to front roof slope. Installation of two rooflights to rear roof slope. Conversion of existing dwellinghouse to 5 self-contained residential units with associated parking, amenity space, cycle parking, and refuse storage

105A Woodcote Grove Road Coulsdon CR5 2AN

DecidedReference: 24/04339/FULLondon Borough of Croydon

Application location

105A Woodcote Grove Road Coulsdon CR5 2AN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full planning permission
Received
23 Dec 2024
Validated
13 Jan 2025
Determination deadline
10 Mar 2025
Local authority
London Borough of Croydon

Application overview

Alteration of roof from hipped to gable end. Erection of part single-storey, part two-storey rear extension incorporating two rear dormers. Installation of four windows to ground floor front elevation. Installation of two dormer windows to front roof slope. Installation of two rooflights to rear roof slope. Conversion of existing dwellinghouse to 5 self-contained residential units with associated parking, amenity space, cycle parking, and refuse storage

Proposal details

Reference
24/04339/FUL
Alternative references
PP-13637803
Ward
Coulsdon Town
Agent
Jameson Architectural Surveyors

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
GRANTED (106G) FULL - DEC NOTICEDecision Notice(s) · PDF28 Jul 2025View
OFFICER REPORT WEB - FINALOfficers Report Final · PDF28 Jul 2025View
UNILATERAL UNDERTAKING REDACTEDDecision Notice(s) · PDF25 Jul 2025View
FULL DRAWING SET AMENDEDAmended Drawings · PDF19 May 2025View
UPDATED SWEPT PATH ANALYSIS 2025Statements / Assessments · PDF4 Mar 2025View
SWEPT PATH ANALYSIS FIG 1Drawing · PDF4 Mar 2025View
SWEPT PATH ANALYSIS FIG 2Drawing · PDF4 Mar 2025View
SWEPT PATH ANALYSIS FIG 3Drawing · PDF4 Mar 2025View
SWEPT PATH ANALYSIS FIG 4Drawing · PDF4 Mar 2025View
SWEPT PATH ANALYSIS FIG 5Drawing · PDF4 Mar 2025View
PROPOSED ELEVATIONS AND 3D MODEL VIEWS 3/3Drawing · PDF16 Jan 2025View
BAT EMERGENCE AND RE-ENTRY SURVEYSStatements / Assessments · PDF16 Jan 2025View
ON SITE BNG BASELINE CALCULATIONStatements / Assessments16 Jan 2025View
BIODIVERSITY NET GAIN BASELINE ASSESSMENTStatements / Assessments · PDF16 Jan 2025View
BIODIVERSITY NET GAIN ASSESSMENTStatements / Assessments · PDF16 Jan 2025View
PRELIMINARY ECOLOGICAL APPRAISAL AND PRELIMINARY ROOST ASSESSMENTStatements / Assessments · PDF16 Jan 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF23 Dec 2024View
DESIGN AND ACCESS STATEMENTStatements / Assessments · PDF23 Dec 2024View
FLOOD RISK ASSESSMENTStatements / Assessments · PDF23 Dec 2024View
FIRE STATEMENTStatements / Assessments · PDF23 Dec 2024View
ARBORICULTURAL IMPACTASSESSMENTStatements / Assessments · PDF23 Dec 2024View
ARBORICULTURALMETHODSTATEMENTStatements / Assessments · PDF23 Dec 2024View
PLANNING STATEMENTStatements / Assessments · PDF23 Dec 2024View
PROPOSED SURFACE WATER STRATEGYStatements / Assessments · PDF23 Dec 2024View
TRANSPORT ASSESSMENTStatements / Assessments · PDF23 Dec 2024View
PARKING STRESS SURVEY & ANALYSISStatements / Assessments · PDF23 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

P. Granted with 106 legal Ag. (3 months)
GRANTED (106G) FULL - DEC NOTICE UNILATERAL UNDERTAKING REDACTED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.