Council planning record

Erection of a pair of two-storey semi-detached dwellinghouses (Use Class C3) with roof level accommodation, Associated amenity, cycle storage, vehicle parking and waste storage spaces, and Alterations including landscaping

3 Beulah Hill Upper Norwood London SE19 3LQ

DecidedReference: 24/04250/FULLondon Borough of Croydon

Last published check: 2 Oct 2026, 12:59. Check the council record for more recent changes.

Application location

3 Beulah Hill Upper Norwood London SE19 3LQ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full planning permission
Received
16 Dec 2024
Validated
2 Jun 2025
Determination deadline
28 Jul 2025
Local authority
London Borough of Croydon

Application overview

Erection of a pair of two-storey semi-detached dwellinghouses (Use Class C3) with roof level accommodation, Associated amenity, cycle storage, vehicle parking and waste storage spaces, and Alterations including landscaping

Proposal details

Reference
24/04250/FUL
Alternative references
PP-13642124
Ward
Crystal Palace And Upper Norwood
Agent
RIBO Associates Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
REFUSED (PR) FULL - DEC NOTICEDecision Notice(s) · PDF5 Sept 2025View
OFFICER REPORT WEB - FINALOfficers Report Final · PDF5 Sept 2025View
FLOOD RISK ASSESSMENTReport · PDF3 Sept 2025View
BNGReport14 Jul 2025View
EOTCorrespondence - Agent/Applicant · PDF14 Jul 2025View
CHARACTER/APPEARANCE CONSERVATION AREASite Notices · PDF18 Jun 2025View
PRELIMINARY BASELINE BIODIVERSITY REPORT -- PREPARED BY AIDASH (15.10.2024)Statements / Assessments · PDF12 Jun 2025View
STATUTORY BIODIVERSITY METRIC TOOLStatements / Assessments12 Jun 2025View
FLOOD RISK ASSESSMENT (REF. 38-40 CVR/FRA-01) -- PREPARED BY RIBO ASSOCIATES LTDStatements / Assessments · PDF12 Jun 2025View
TOPOGRAPHICAL SURVEYDrawing · PDF12 Jun 2025View
REFUSE & RECYCLING STRATEGYStatements / Assessments · PDF12 Jun 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF16 Dec 2024View
SITE LOCATION PLANDrawing · PDF16 Dec 2024View
BLOCK PLANDrawing · PDF16 Dec 2024View
PROPOSED SITE PLANDrawing · PDF16 Dec 2024View
PROPOSED GROUND AND FIRST FLOOR PLANSDrawing · PDF16 Dec 2024View
PROPOSED LOFT AND ROOF PLANSDrawing · PDF16 Dec 2024View
PROPOSED FRONT AND REAR ELEVATIONSDrawing · PDF16 Dec 2024View
PROPOSED SIDE ELEVATIONSDrawing · PDF16 Dec 2024View
PROPOSED SECTIONALSDrawing · PDF16 Dec 2024View
PROPOSED LONG SECTIONALSDrawing · PDF16 Dec 2024View
DESIGN & ACCESS STATEMENT, HERITAGE & SUSTAINABILITY -- PREPARED BY RIBO ASSOCIAStatements / Assessments · PDF16 Dec 2024View
ARBORICULTURAL SURVEY IMPACT ASSESSMENT & METHOD STATEMENT REPORT (REF. AIA/MF/0Statements / Assessments · PDF16 Dec 2024View
DESIGN & HERITAGE STATEMENT (REF. 3BH-R/FS/3.02) -- PREPARED BY RIBO ASSOCIATESStatements / Assessments · PDF16 Dec 2024View
PLANNING FIRE SAFETY STRATEGY (REF. 3BH-R/FS/3.01) -- PREPARED BY RIBO ASSOCIATEStatements / Assessments · PDF16 Dec 2024View
PLANNING STATEMENT -- PREPARED BY PLANNING & PARTY WALL SPECIALISTS LIMITEDStatements / Assessments · PDF16 Dec 2024View
COVERING LETTER (REF. 3BH-R/P/3.01) -- PREPARED BY RIBO ASSOCIATES LTD (12.11.20Other · PDF16 Dec 2024View
BASELINE ONSITE HABITAT MAP/PLAN (PRE-DEVELOPMENT)Drawing · PDF16 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Last Site Notice Posted Date

    Published milestoneCouncil source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision Issued Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Permission Refused
REFUSED (PR) FULL - DEC NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.