Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Camden. Search an address, application reference or proposal to find a record.
23,448 approved · 2,066 refused · 2,366 withdrawn. Received dates in our records: 5 Apr 2017 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
We haven’t verified direct planning guidance links for this authority yet. Use its official website in Council sources.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
40 - 44 Cholmley Gardens London NW6 1AH
Received 15 Feb 202115 Princess Road London NW1 8JR
Received 12 Mar 202125 Aberdare Gardens London NW6 3AJ
Received 16 Feb 202199 Gloucester Avenue London NW1 8LB
Received 16 Feb 2021Arthur Stanley House 40 - 50 Tottenham Street London W1T 4RN
Received 23 Feb 20215 Belsize Park Mews London NW3 5BL
Received 1 Apr 2021Gloucester Gate Playground Gloucester Gate The Regents Park London NW1 4HG
Received 12 Mar 20211 Fitzroy Mews London W1T 6DE
Received 29 Mar 2021Hampstead Britannia Hotel Primrose Hill Road London NW3 3NA
Received 16 Mar 2021Pooja Court Agar Grove London NW1 9EN
Received 15 Feb 202144 Mornington Terrace London NW1 7RT
Received 23 Feb 20214 Cannon Place London NW3 1EJ
Received 17 Feb 202194 Priory Road London NW6 3NT
Received 17 Feb 2021Former Odeon Site and Rosenheim Building 25 Grafton Way London WC1E 6DB
Received 15 Mar 202155-57 Holmes Road London NW5 3AN
Received 20 Mar 202136 West Hill Park London N6 6ND
Received 17 Feb 202114 Belsize Park Gardens London NW3 4LD
Received 17 Feb 202137 Shirlock Road London NW3 2HR
Received 17 Feb 202146 Shirlock Road London NW3 2HS
Received 1 Apr 2021142 Abbey Road London NW6 4SL
Received 17 Feb 202126 Leighton Road London NW5 2QE
Received 19 Mar 2021Flat 1st Floor Front 5 Belsize Park Gardens London NW3 4LB
Received 16 Apr 2021Acland Burghley School 93 Burghley Road London NW5 1UJ
Received 17 Feb 2021111 Frognal London NW3 6XR
Received 18 Feb 2021Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Camden, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage