Removal of suspended timber floor throughout internal basement. Excavation to accommodate new flooring system. Cast masonry footings to support approximately 2.5 metres of partition wall carrying M&E services along B99. Installation of a new reinforced and insulated, in-situ concrete slab with DPM. Apply a cementitious screed to the new floor, followed by a liquid DPM to reduce curing time before installing subsequent floor finishes. Demolish selected internal partitions without footings and reinstate with new FR60 metal stud partitions and timber skirting. Replacement of three internal doorsets with new FD30 and associated fixtures. Replacement of two existing entrance/exit doors with new FD30, incorporating access control and appropriate ironmongery. - Removal of the cupboard identified as B99A. Refurbishment of two sash windows and their sills on the front elevation facing Gower Street. Installation of 2no non fire rated doors and locking cylinders to the understairs cupboards. Installation of new carpet tiles and vinyl floor finishes
Removal of suspended timber floor throughout internal basement. Excavation to accommodate new flooring system. Cast masonry footings to support approximately 2.5 metres of partition wall carrying M&E services along B99. Installation of a new reinforced and insulated, in-situ concrete slab with DPM. Apply a cementitious screed to the new floor, followed by a liquid DPM to reduce curing time before installing subsequent floor finishes. Demolish selected internal partitions without footings and reinstate with new FR60 metal stud partitions and timber skirting. Replacement of three internal doorsets with new FD30 and associated fixtures. Replacement of two existing entrance/exit doors with new FD30, incorporating access control and appropriate ironmongery. - Removal of the cupboard identified as B99A. Refurbishment of two sash windows and their sills on the front elevation facing Gower Street. Installation of 2no non fire rated doors and locking cylinders to the understairs cupboards. Installation of new carpet tiles and vinyl floor finishes
Reference
2026/5069/L
Ward
Bloomsbury
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.