FRONT GARDEN: 1 x Robinia (T1) - Northern Crown remove the forked dying branch growing southward which will be pruned back to first viable growth points. Reduce back to previous and most recent points of reduction whilst furnishing growth to ensure crown continuity and preserve aesthetic value. Southern Crown - Reduce lateral and sub lateral growth over neighbouring property and path by approximately 1.2m to control encroachment. Thin density by approx. 20%. Reduce any other extraneous over long branches back into the main crown structure (not more than 1.4m). Raise crown of the whole tree by approx. 1.2m - 1.4m.
98 Priory Road London NW6 3NT
London Borough of CamdenReference 2026/5019/TNotification of Intended Works to Tree(s) in a Conservation Area
Last published check: 24 Nov 2026, 09:25. Check the council record for more recent changes.
Notification of Intended Works to Tree(s) in a Conservation Area
Ward
South Hampstead
Documents
1 published
Proposal
FRONT GARDEN: 1 x Robinia (T1) - Northern Crown remove the forked dying branch growing southward which will be pruned back to first viable growth points. Reduce back to previous and most recent points of reduction whilst furnishing growth to ensure crown continuity and preserve aesthetic value. Southern Crown - Reduce lateral and sub lateral growth over neighbouring property and path by approximately 1.2m to control encroachment. Thin density by approx. 20%. Reduce any other extraneous over long branches back into the main crown structure (not more than 1.4m). Raise crown of the whole tree by approx. 1.2m - 1.4m.
Reference
2026/5019/T
Ward
South Hampstead
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.