Council planning record

Redevelopment to include demolition of the 1980s office buildings and erection of a 26-storey building (plus mezzanine and two basement levels) of a maximum height of 108.0m AOD, restoration and refurbishment of the listed terrace (nos. 4-16 St Thomas Street), and redevelopment of Keats House (nos. 24-26 St Thomas Street) with removal, relocation and reinstatement of the historic façade on a proposed building, to provide 46,851sqm GEA of Class E(g)(i) office floorspace, 360sqm GEA flexible office E(g)(i)/retail E(a) floorspace, 592sqm GEA Class E(b) restaurant/café floorspace and a public rooftop garden, and 5,190sqm GEA of affordable workspace within the Georgian terrace, Keats House and part of the tower, associated public realm and highways improvements, provision for a new access to the Borough High Street entrance to the Underground Station, cycling parking, car parking, service, refuse and plant areas, and all ancillary or associated works.

New City Court 4-26 St Thomas Street London

Final DecisionReference: 2021/2319/PLondon Borough of Camden

Last published check: 4 Oct 2026, 02:36. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. received

    Published milestoneCouncil source
  2. validated

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source

Application summary

Status
Final Decision
Application type
Request for Observations to Adjoining Borough
Received
10 Jun 2021
Validated
10 Jun 2021
Determination deadline
Not published
Local authority
London Borough of Camden

Application overview

Redevelopment to include demolition of the 1980s office buildings and erection of a 26-storey building (plus mezzanine and two basement levels) of a maximum height of 108.0m AOD, restoration and refurbishment of the listed terrace (nos. 4-16 St Thomas Street), and redevelopment of Keats House (nos. 24-26 St Thomas Street) with removal, relocation and reinstatement of the historic façade on a proposed building, to provide 46,851sqm GEA of Class E(g)(i) office floorspace, 360sqm GEA flexible office E(g)(i)/retail E(a) floorspace, 592sqm GEA Class E(b) restaurant/café floorspace and a public rooftop garden, and 5,190sqm GEA of affordable workspace within the Georgian terrace, Keats House and part of the tower, associated public realm and highways improvements, provision for a new access to the Borough High Street entrance to the Underground Station, cycling parking, car parking, service, refuse and plant areas, and all ancillary or associated works.

Proposal details

Reference
2021/2319/P

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

New City Court 4-26 St Thomas Street London

Location point supplied by the council.

View location map

Documents 1 of 1

DocumentPublishedAction
Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

No objection
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.