Council planning record

The proposed refurbishment includes works to every floor of the building. The Scope of works includes: - Removal of existing partition walls and construction of new partitions to create different spaces using different material such as glazed screen. - New openings in existing internal masonry walls, required for efficient circulation. - Ancillary Structural works regarding the installation of proper lintels and floor structural reinforcement where needed to support new loads for the proposed new floor finishes, under floor heating and proposed furniture. - Remove all sanitaryware and radiators. - Allow for new plumbing, sanitaryware and heating system. - Replace lighting fixtures in accordance to new architectural layout. - New Tiling, Decoration and Flooring throughout. The proposed internal layout has caused the upgrading of the escape routes, to comply with the current standard required by Building Regulation in terms of Fire Safety.

1-2 Chester Gate London NW1 4JH

WithdrawnReference: 2020/2963/LLondon Borough of Camden

Last published check: 9 Oct 2026, 15:51. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. validated

    Published milestoneCouncil source
  2. received

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source

Application summary

Status
Withdrawn
Application type
Listed Building Consent
Received
7 Jul 2020
Validated
3 Jul 2020
Determination deadline
Not published
Local authority
London Borough of Camden

Application overview

The proposed refurbishment includes works to every floor of the building. The Scope of works includes: - Removal of existing partition walls and construction of new partitions to create different spaces using different material such as glazed screen. - New openings in existing internal masonry walls, required for efficient circulation. - Ancillary Structural works regarding the installation of proper lintels and floor structural reinforcement where needed to support new loads for the proposed new floor finishes, under floor heating and proposed furniture. - Remove all sanitaryware and radiators. - Allow for new plumbing, sanitaryware and heating system. - Replace lighting fixtures in accordance to new architectural layout. - New Tiling, Decoration and Flooring throughout. The proposed internal layout has caused the upgrading of the escape routes, to comply with the current standard required by Building Regulation in terms of Fire Safety.

Proposal details

Reference
2020/2963/L
Ward
Regents Park (Pre May 2022)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

1-2 Chester Gate London NW1 4JH

Location point supplied by the council.

View location map

Documents 1 of 1

DocumentPublishedAction
Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Withdrawn Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.