Council planning record

Request for screening opinion under Regulation 15 of the Town and Country Planning Environmental Impact Assessment (EIA) Regulations 2017, for proposed development involving the partial demolition of the non-designated existing buildings and structures on the site and the retention, refurbishment and partial extension to the listed Lethaby Building. The proposals include circa 431 hotel rooms (C1), exhibition space, a cultural use, gym, other ancillary hotel uses and 33 affordable housing units. The resulting buildings within the development include the ground level plus 5 storey Lethaby Building, a new ground level plus 8 storey block and the refurbished and extended Red Lion Building which would range between ground level plus 7 storeys up to ground level plus 14 storeys. The siting and layout of buildings within the site would define a new pedestrian street and public courtyard space.

Lethaby Building, Former Cochrane Theatre, 12-42 Southampton Row & 1-4 Red Lion Square London WC1B

Final DecisionReference: 2020/0600/PLondon Borough of Camden

Last published check: 10 Oct 2026, 09:56. Check the council record for more recent changes.

Application location

Lethaby Building, Former Cochrane Theatre, 12-42 Southampton Row & 1-4 Red Lion Square London WC1B

Location point supplied by the council.

View location map

Application summary

Status
Final Decision
Application type
Request for Screening Opinion
Received
6 Feb 2020
Validated
6 Feb 2020
Determination deadline
Not published
Local authority
London Borough of Camden

Application overview

Request for screening opinion under Regulation 15 of the Town and Country Planning Environmental Impact Assessment (EIA) Regulations 2017, for proposed development involving the partial demolition of the non-designated existing buildings and structures on the site and the retention, refurbishment and partial extension to the listed Lethaby Building. The proposals include circa 431 hotel rooms (C1), exhibition space, a cultural use, gym, other ancillary hotel uses and 33 affordable housing units. The resulting buildings within the development include the ground level plus 5 storey Lethaby Building, a new ground level plus 8 storey block and the refurbished and extended Red Lion Building which would range between ground level plus 7 storeys up to ground level plus 14 storeys. The siting and layout of buildings within the site would define a new pedestrian street and public courtyard space.

Proposal details

Reference
2020/0600/P
Ward
Holborn & Covent Garden (Pre May 2022)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. received

    Published milestoneCouncil source
  2. validated

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source

Decision & conditions

EIA Not Required
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.