Council planning record

Discharge of Conditions 7 (Rainwater and greywater harvesting), 13 (Construction Management Plan (CMP), 25 (Local Employment Plan), 14 (CMP monitoring contribution), 18 (AIP), 20 (Office Travel Plan contribution), 22 (Event Travel Plan Contribution), 27(Employment and training contribution) and 28 (Highway works contribution) granted against reference 2019/2238/P dated 20/12/19 for external and internal alterations relating to the part change of use of Camden Town Hall at (part) basement, second and third floors to office use (B1), and the change of use of the Camden Centre to Events use. External physical works to include the demolition of the 3rd floor conservatory and replacement infill pavilion, demolition of 1960s Euston Road entrance, covering over three lightwells at roof level, opening up for two new doorways on Bidborough Street and two new doorways on Tonbridge Walk, works to the Judd Street entrance, refurbishment of windows, cleaning and facade repairs. Internal works include the refurbishment and conservation repairs to ground and first floor to improve civic and democratic services, refurbishment and changes to layout on basement, second and third floor to accommodate new offices, installation of new circulation core in south east lightwell, new office reception, new lift and dumbwaiter in the Camden Centre. New roof plant and services throughout, targeted basement excavation for lift pits and attenuation tanks, waste storage, cycle parking, public realm improvements, new on street loading bay and other associated works.

Town Hall Judd Street London WC1H 9JE

Final DecisionReference: 2019/6396/PLondon Borough of Camden

Last published check: 10 Oct 2026, 14:06. Check the council record for more recent changes.

Application location

Town Hall Judd Street London WC1H 9JE

Location point supplied by the council.

View location map

Application summary

Status
Final Decision
Application type
Approval of Details
Received
17 Jan 2020
Validated
23 Dec 2019
Determination deadline
Not published
Local authority
London Borough of Camden

Application overview

Discharge of Conditions 7 (Rainwater and greywater harvesting), 13 (Construction Management Plan (CMP), 25 (Local Employment Plan), 14 (CMP monitoring contribution), 18 (AIP), 20 (Office Travel Plan contribution), 22 (Event Travel Plan Contribution), 27(Employment and training contribution) and 28 (Highway works contribution) granted against reference 2019/2238/P dated 20/12/19 for external and internal alterations relating to the part change of use of Camden Town Hall at (part) basement, second and third floors to office use (B1), and the change of use of the Camden Centre to Events use. External physical works to include the demolition of the 3rd floor conservatory and replacement infill pavilion, demolition of 1960s Euston Road entrance, covering over three lightwells at roof level, opening up for two new doorways on Bidborough Street and two new doorways on Tonbridge Walk, works to the Judd Street entrance, refurbishment of windows, cleaning and facade repairs. Internal works include the refurbishment and conservation repairs to ground and first floor to improve civic and democratic services, refurbishment and changes to layout on basement, second and third floor to accommodate new offices, installation of new circulation core in south east lightwell, new office reception, new lift and dumbwaiter in the Camden Centre. New roof plant and services throughout, targeted basement excavation for lift pits and attenuation tanks, waste storage, cycle parking, public realm improvements, new on street loading bay and other associated works.

Proposal details

Reference
2019/6396/P
Ward
Kings Cross (Pre May 2022)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. validated

    Published milestoneCouncil source
  2. received

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source

Decision & conditions

Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.