Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP
Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP
Location point supplied by the council.
View location mapDischarge of Condition 94 (BREEAM Certification) granted under planning reference 2013/4678/P dated16/05/14 for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Council application recordPublic record link | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.