Status on council recordCouncil status: Final Decision

Observations to the adjoining borough of Brent Council for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m² of floorspace (GEA excluding infrastructure) comprising: retail/financial and professional services/food and drink (Class A1-A5): 17,000m² to 30,000m²; Business (Class B1): up to 25,000m²; Hotel (Class C1): 5,000m² to 20,000m²; Residential dwellings (Class C3): 65,000m² to 100,000m² (815 to 1,300 units); Community (Class D1): 1,500m² to 3,000m²; Leisure and Entertainment (Class D2): up to 5,000m²; Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m² to 25,000m²; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way (accompained by an Environmental Impact Assessment).

Former Palace of Arts & Palace of Industry Site Engineers Way Wembley BRENT HA9

London Borough of CamdenReference 2011/1703/PRequest for Observations to Adjoining Borough

Last published check: 10 Nov 2026, 17:46. Check the council record for more recent changes.

Status and dates

Last published check: 10 Nov 2026, 17:46 (UK)

  1. DoneReceived13 Apr 2011
  2. DoneValidated5 Apr 2011
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNo objectionNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. validated

    Published milestoneCouncil source
  2. received

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source
Application type
Request for Observations to Adjoining Borough
Ward
Adjoining Borough
Documents
1 published

Proposal

Observations to the adjoining borough of Brent Council for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m² of floorspace (GEA excluding infrastructure) comprising: retail/financial and professional services/food and drink (Class A1-A5): 17,000m² to 30,000m²; Business (Class B1): up to 25,000m²; Hotel (Class C1): 5,000m² to 20,000m²; Residential dwellings (Class C3): 65,000m² to 100,000m² (815 to 1,300 units); Community (Class D1): 1,500m² to 3,000m²; Leisure and Entertainment (Class D2): up to 5,000m²; Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m² to 25,000m²; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way (accompained by an Environmental Impact Assessment).

Reference
2011/1703/P
Ward
Adjoining Borough

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No objection
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.