Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
ApprovedCouncil status: Final Decision
4,5 and 6 Bedford Square London WC1B 3RD
Last published check: 11 Nov 2026, 05:24. Check the council record for more recent changes.
Last published check: 11 Nov 2026, 05:24 (UK)
Dates come from the council record. A target date passing does not confirm a decision.
Listed Building Consent for alterations including the creation of linkages between No 4-5 & No 6 Bedford Square at basement and ground floor level, the reinstatement of a staircase between second and third floor within No 4, removal of a modern first floor stud partition wall within No 5, insertion of stud partition walls at basement and third floor level of No 6 and the reconfiguration of toilet layouts in No 4-5 Bedford Square to existing mixed use building (Class D1/B1).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsDocuments open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.