Status on council recordCouncil status: Final Decision

Observations to the adjoining borough of Brent Council for for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m² of floorspace (GEA, excluding infrastructure) comprising: Retail/financial and professional services/food and drink (Use Class A1 to A5): 17,000m² to 30,000m²; Business (Use Class B1): up to 25,000m²; Hotel (Use Class C1): 5,000m² to 20,000m²; Residential dwellings (Use Class C3): 65,000m² to 100,000m² (815 to 1,300 units); Community (Use Class D1): 1,500m² to 3,000m²; Leisure and Entertainment (Use Class D2): up to 5,000m²; and Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m² to 25,000m²; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way. This proposal is accompanied by an Environmental Statement.

Former Palace of Arts & Palace of Industry Site, Engineers Way, Wembley, HA9

London Borough of CamdenReference 2010/6655/PRequest for Observations to Adjoining Borough

Last published check: 11 Nov 2026, 09:01. Check the council record for more recent changes.

Status and dates

Last published check: 11 Nov 2026, 09:01 (UK)

  1. DoneReceived8 Dec 2010
  2. DoneValidated7 Dec 2010
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNo objectionNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. validated

    Published milestoneCouncil source
  2. received

    Published milestoneCouncil source
  3. decision

    Published milestoneCouncil source
  4. source_updated

    Published milestoneCouncil source
Application type
Request for Observations to Adjoining Borough
Ward
Adjoining Borough
Documents
1 published

Proposal

Observations to the adjoining borough of Brent Council for for the demolition of existing buildings and the mixed-use redevelopment of the site to provide up to 160,000m² of floorspace (GEA, excluding infrastructure) comprising: Retail/financial and professional services/food and drink (Use Class A1 to A5): 17,000m² to 30,000m²; Business (Use Class B1): up to 25,000m²; Hotel (Use Class C1): 5,000m² to 20,000m²; Residential dwellings (Use Class C3): 65,000m² to 100,000m² (815 to 1,300 units); Community (Use Class D1): 1,500m² to 3,000m²; Leisure and Entertainment (Use Class D2): up to 5,000m²; and Student accommodation/serviced apartments/apart-hotels (Sui Generis): 7,500m² to 25,000m²; and associated infrastructure including footways, roads, parking, cycle parking, servicing, open spaces, landscaping, plant, utilities and works to Olympic Way. This proposal is accompanied by an Environmental Statement.

Reference
2010/6655/P
Ward
Adjoining Borough

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Council application recordPublic record linkNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No objection
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.