Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
PlanningTrack collects planning applications and decisions from the public planning register of London Borough of Brent. Search an address, application reference or proposal. Official Brent website
31,562 approved · 11,806 refused · 2,150 withdrawn. Received dates in our records: 9 Sept 2008 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
73 Vista Way, Harrow, HA3 0SJ
Received 4 Feb 201573 Vista Way, Harrow, HA3 0SJ
Received 4 Feb 20154 Beaconsfield Road, London, NW10 2JG
Received 4 Feb 201543 Shaftesbury Avenue, Harrow, HA3 0RA
Received 23 Feb 2015172 Hanover Road, London, NW10 3DP
Received 4 Feb 20153 Byron Avenue, London, NW9 0ER
Received 4 Feb 201565 Fairway Avenue, London, NW9 0EL
Received 4 Feb 2015147 Geary Road, London, NW10 1HS
Received 4 Feb 2015147 Geary Road, London, NW10 1HS
Received 4 Feb 201564 Woodhill Crescent, Harrow, HA3 0LY
Received 4 Feb 2015147 Geary Road, London, NW10 1HS
Received 4 Feb 20156 Hillfield Avenue, Wembley, HA0 4JS
Received 12 Feb 201526 Woodcock Dell Avenue, Harrow, HA3 0NS
Received 3 Feb 201512 The Mount, Wembley, HA9 9EE
Received 4 Feb 201531 Elms Park Avenue, Wembley, HA0 2RR
Received 4 Feb 201552 Winchester Avenue, Kilburn, London, NW6 7TU
Received 4 Feb 201522A & 22B Chevening Road, London, NW6 6DD
Received 23 Feb 201550 Plympton Road, London, NW6 7EQ
Received 4 Feb 201549 & 49A Salusbury Road, London, NW6 6NJ
Received 23 Feb 2015338 Stag Lane, London, NW9 9AG
Received 4 Feb 201533 Tudor Court North, Wembley, HA9 6SG
Received 24 Feb 2015445 North Circular Road, Stonebridge, London, NW10 0HP
Received 5 Feb 201585A High Road, London, NW10 2SU
Received 4 Feb 20152 Greenbank Avenue, Wembley, HA0 2TF
Received 25 Feb 2015Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsArea alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.
Set up an area alertStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Brent, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage