Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
PlanningTrack collects planning applications and decisions from the public planning register of London Borough of Brent. Search an address, application reference or proposal. Official Brent website
31,562 approved · 11,806 refused · 2,150 withdrawn. Received dates in our records: 9 Sept 2008 to 25 Nov 2026. Most recent record check: 27 Nov 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
1 OLD ST ANDREWS MANSIONS, Old Church Lane, London, NW9 8TB
Received 1 Dec 201415 Linacre Road, London, NW2 5AY
Received 13 Oct 201448 Litchfield Gardens, London, NW10 2LL
Received 13 Oct 2014244 Ealing Road, Wembley, HA0 4QL
Received 31 Oct 2014126 Preston Road, Wembley, HA9 8NL
Received 15 Oct 2014Building 2, Central Square, Central Square, Wembley, HA9
Received 24 Oct 2014147B Harlesden Road, London, NW10 2BS
Received 13 Oct 2014113 Salmon Street, London, NW9 8NG
Received 13 Oct 20148A Upton Gardens, Harrow, HA3 0DL
Received 13 Oct 2014Building 2, Central Square, Central Square, Wembley, HA9
Received 13 Oct 201415 Linacre Road, London, NW2 5AY
Received 13 Oct 201448 Litchfield Gardens, London, NW10 2LL
Received 13 Oct 2014296 Willesden Lane, Willesden, London, NW2 5BZ
Received 13 Oct 2014First Floor Flat, 89 Cobbold Road, London, NW10 9SU
Received 13 Oct 201463 -67 Craven Park, London, NW10 8SR
Received 13 Oct 2014119 Crest Road, London, NW2 7NA
Received 14 Oct 201431A Malvern Road, London, NW6 5PS
Received 14 Oct 201418 Chelmsford Square, London, NW10 3AR
Received 15 Oct 201419 Bridge Road, Wembley, HA9 9AB
Received 14 Oct 201467 Mount Pleasant, Wembley, HA0 1UD
Received 14 Oct 201424A Dicey Avenue, London, NW2 6AT
Received 14 Oct 201424A & 24B Dicey Avenue, London, NW2
Received 14 Oct 2014First Central, Lakeside Drive, London
Received 14 Oct 201467 Mount Pleasant, Wembley, HA0 1UD
Received 14 Oct 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsArea alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.
Set up an area alertStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Brent, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage