Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Brent. Search an address, application reference or proposal to find a record.
6,285 approved · 1,825 refused · 213 withdrawn. Received dates in our records: 1 Nov 2021 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
24 Beaumont Avenue, Wembley, HA0 3BZ
Received 25 Mar 202660 Chaplin Road, Wembley, HA0 4UL
Received 25 Mar 202644 Cairnfield Avenue, London, NW2 7PE
Received 24 Mar 202610 Sunny View, London, NW9 0UP
Received 26 Mar 2026369B Kilburn High Road, London, NW6 7QB
Received 25 Mar 20263 Grittleton Avenue, Wembley, HA9 6NX
Received 25 Mar 202640 Meadow Garth, London, NW10 0SJ
Received 25 Mar 202625 Dollis Hill Avenue, London, NW2 6EU
Received 25 Mar 202683 Chevening Road, London, NW6 6DA
Received 26 Mar 20263 Hamilton Road, London, NW10 1NU
Received 26 Mar 202631 Malvern Mews, London, NW6 5PT
Received 26 Mar 202625 Abercorn Gardens, Harrow, HA3 0PB
Received 26 Mar 202654 Grove Crescent, London, NW9 0LP
Received 26 Mar 202645 Stag Lane, Edgware, HA8 5LH
Received 26 Mar 2026149 Brondesbury Park, Brondesbury, London, NW2 5JL
Received 26 Mar 202654 Grove Crescent, London, NW9 0LP
Received 26 Mar 2026149 Brondesbury Park, Brondesbury, London, NW2 5JL
Received 26 Mar 2026Workshop, 259A Water Road, Wembley, HA0 1HX
Received 27 Mar 2026Telecommunications Mast Roof Top of, 1A Olympic Way, Wembley
Received 25 Mar 202634 Ambleside Gardens, Wembley, HA9 8TL
Received 27 Mar 20267 St Michaels Road, London, NW2 6XD
Received 26 Mar 2026Former Trinity House, Heather Park Drive, Wembley, HA0 1SU
Received 27 Mar 20268-9 Neeld Parade, Wembley Hill Road, Wembley, HA9 6QU
Received 27 Mar 202652 Coles Green Road, London, NW2 7ES
Received 27 Mar 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Brent, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage