Council planning record

Replacement of existing single glazed timber framed sash windows and rooflights with double glazed timber framed sash windows and rooflights, existing single framed timber framed front and rear doors with new double glazed timber framed doors, main roofs to be replaced including all tiles, eaves, ridges, hips and verges to match existing style and roof to rear extension replaced with a liquid covering.

805A & 805B Harrow Road, Wembley, HA0 2LP

DecidedReference: 26/1094London Borough of Brent

Last published check: 12 Oct 2026, 06:23. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Full Planning Permission
Received
29 Apr 2026
Validated
11 May 2026
Determination deadline
Not published
Local authority
London Borough of Brent

Application overview

Replacement of existing single glazed timber framed sash windows and rooflights with double glazed timber framed sash windows and rooflights, existing single framed timber framed front and rear doors with new double glazed timber framed doors, main roofs to be replaced including all tiles, eaves, ridges, hips and verges to match existing style and roof to rear extension replaced with a liquid covering.

Proposal details

Reference
26/1094
Alternative references
PP-14885387
Ward
Sudbury
Agent
Archway Building Consultancy Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

805A & 805B Harrow Road, Wembley, HA0 2LP

This record has no verified map location.

View council map

Documents 15 of 15

DocumentPublishedAction
Proposed window and door scheduleApproved Drawing Plans · PDF13 Jul 2026View
Existing window and door scheduleApproved Drawing Plans · PDF13 Jul 2026View
Existing elevationsApproved Drawing Plans · PDF13 Jul 2026View
Proposed elevationsApproved Drawing Plans · PDF13 Jul 2026View
Location planApproved Drawing Plans · PDF13 Jul 2026View
Block planApproved Drawing Plans · PDF13 Jul 2026View
Existing and proposed roof plansApproved Drawing Plans · PDF13 Jul 2026View
Final delegated reportReport · PDF13 Jul 2026View
Final decision noticeDecision (Public) · PDF13 Jul 2026View
Fire safety statementApproved Documents · PDF30 Apr 2026View
Technical drawing heritage sliding sashApproved Documents · PDF30 Apr 2026View
58mm door set open in - standardApproved Documents · PDF30 Apr 2026View
Technical details doorsApproved Documents · PDF30 Apr 2026View
Design and access statementApproved Documents · PDF30 Apr 2026View
Application formApplication Form (Public) · PDF30 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permission Granted
Final decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.