Council planning record

Demolition of the existing 2-storey recording studios and the erection of a 4-storey (plus basement) mixed-use building with lightwells, providing a total of 3 x commercial units (over ground and basement levels) and 9 x residential units with balconies, hard and soft landscaping to forecourt and provision of 2 pedestrian access points and 2 vehicular access points, alteration to existing dropped kerbs to accommodate pedestrian access, accessible parking bay and service bay to forecourt, new side and rear boundary walls, alterations to existing front boundary wall and addition of metal gates, and provision of cycle and refuse/recycle storage

Battery Studios, 1 Maybury Gardens, London, NW10 2NB

RegisteredReference: 26/0497London Borough of Brent

Last published check: 10 Oct 2026, 23:35. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Registered
Application type
Full Planning Permission
Received
26 Feb 2026
Validated
19 Mar 2026
Determination deadline
Not published
Local authority
London Borough of Brent

Application overview

Demolition of the existing 2-storey recording studios and the erection of a 4-storey (plus basement) mixed-use building with lightwells, providing a total of 3 x commercial units (over ground and basement levels) and 9 x residential units with balconies, hard and soft landscaping to forecourt and provision of 2 pedestrian access points and 2 vehicular access points, alteration to existing dropped kerbs to accommodate pedestrian access, accessible parking bay and service bay to forecourt, new side and rear boundary walls, alterations to existing front boundary wall and addition of metal gates, and provision of cycle and refuse/recycle storage

Proposal details

Reference
26/0497
Alternative references
PP-14667144
Ward
Roundwood
Agent
Apcar Smith Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Battery Studios, 1 Maybury Gardens, London, NW10 2NB

This record has no verified map location.

View council map

Documents 81 of 81

DocumentPublishedAction
Heritage addendum september 2026 prepared by bidwellsSupporting Documents · PDF8 Oct 2026View
Historic england listing initial assessment reportConsultee Comments (Public) · PDF19 Aug 2026View
Heritage statement addendumSupporting Documents · PDF17 Aug 2026View
Heritage statement dated june 2026 prepared by bidwellsSupporting Documents · PDF18 Jun 2026View
Floor level 01 & 02 landscape proposals planSubmitted Drawings Plans · PDF18 Jun 2026View
Basement and ground floor landscape proposals planSubmitted Drawings Plans · PDF18 Jun 2026View
Floor level 03 & roof landscape proposals planSubmitted Drawings Plans · PDF18 Jun 2026View
Urban greening factor planSubmitted Drawings Plans · PDF18 Jun 2026View
Cgi proposed view 6Submitted Drawings Plans · PDF18 Jun 2026View
Brents site notice 30/04/2026Original Submission · PDF30 Apr 2026View
Site noticeConsultation · PDF30 Apr 2026View
List - consulted on applicationConsultation · PDF2 Apr 2026View
List - consultedConsultation · PDF2 Apr 2026View
Proposed third floor planSubmitted Drawings Plans · PDF19 Mar 2026View
Proposed roof planSubmitted Drawings Plans · PDF19 Mar 2026View
Cycle & refuse store detailsSubmitted Drawings Plans · PDF19 Mar 2026View
Proposed first floor planSubmitted Drawings Plans · PDF19 Mar 2026View
Proposed second floor planSubmitted Drawings Plans · PDF19 Mar 2026View
Existing elevationsSubmitted Drawings Plans · PDF10 Mar 2026View
Site plan, location plan & existing site/ roof planSubmitted Drawings Plans · PDF26 Feb 2026View
Existing ground floor planSubmitted Drawings Plans · PDF26 Feb 2026View
Existing first floor planSubmitted Drawings Plans · PDF26 Feb 2026View
Existing sectionsSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed ground floor & site plansSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed basement planSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed streetscene & front elevationsSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed side elevationsSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed rear/north west elevationsSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed sections aa' & bb'Submitted Drawings Plans · PDF26 Feb 2026View
Proposed sections cc' & dd'Submitted Drawings Plans · PDF26 Feb 2026View
Proposed partial section cc' & 3d viewsSubmitted Drawings Plans · PDF26 Feb 2026View
Proposed 3d views: sheet 1Supporting Documents · PDF26 Feb 2026View
Proposed 3d views sheet 2Submitted Drawings Plans · PDF26 Feb 2026View
Design and access statement part 2146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Final viability report with appendix tv3.0051225146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Dynamic overheating risk assessmentSupporting Documents · PDF26 Feb 2026View
Battery studios - energy sustainability statement146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Partl2021glacarbonemissionreportingspreadsheetv2.00146671440000.xlsxSupporting Documents26 Feb 2026View
Preliminary roost assessment & emergence survey prepared by ecology network dateSupporting Documents · PDF26 Feb 2026View
Architectural modifications to benefit batsSupporting Documents · PDF26 Feb 2026View
Biodiversity statement prepared by ecology network dated december 2025Supporting Documents · PDF26 Feb 2026View
Preliminary ecology appraisal prepared by ecology network dated december 2025Supporting Documents · PDF26 Feb 2026View
25002 batterystudios tree cond ass146671440000.xlsSupporting Documents26 Feb 2026View
Onsite baseline mapSupporting Documents · PDF26 Feb 2026View
Battery studios - on-site post intervention map v3146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Biod metric calc - battery studios v3 no macros146671440000.xlsxSupporting Documents26 Feb 2026View
Air quality assessment prepared by gem dated october 2025Supporting Documents · PDF26 Feb 2026View
Structural method statement dated december 2025 prepared by halsteadsSupporting Documents · PDF26 Feb 2026View
C3661brent proforma146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Flood risk assessment & drainage strategy reportSupporting Documents · PDF26 Feb 2026View
Construction management planSupporting Documents · PDF26 Feb 2026View
Delivery and servicing planSupporting Documents · PDF26 Feb 2026View
Transport statementSupporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessmentSupporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 2 - appendix bSupporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 3 - appendix cSupporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 4Supporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 45Supporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 6Supporting Documents · PDF26 Feb 2026View
Phase 1 geoenvironmental preliminary risk assessment part 7Supporting Documents · PDF26 Feb 2026View
Basement impact assessment version v1.0-3/21Supporting Documents · PDF26 Feb 2026View
Fire strategy for planning application revision 2Supporting Documents · PDF26 Feb 2026View
Fire statement formSupporting Documents · PDF26 Feb 2026View
Floor level 01 & 02 landscape proposals planSubmitted Drawings Plans · PDF26 Feb 2026View
Ground floor landscape proposals planSubmitted Drawings Plans · PDF26 Feb 2026View
Floor level 03 & roof landscape proposals planSupporting Documents · PDF26 Feb 2026View
Urban greening factorSupporting Documents · PDF26 Feb 2026View
Arboricultural impact assessment and method statementSupporting Documents · PDF26 Feb 2026View
Tree survey planSupporting Documents · PDF26 Feb 2026View
Tree scheduleSupporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 1)Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 2)Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 3))Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 4)Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 5)Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 6)Supporting Documents · PDF26 Feb 2026View
Daylight & sunlight report (part 7)Supporting Documents · PDF26 Feb 2026View
Cgi'sSupporting Documents · PDF26 Feb 2026View
Design and access statement-part 1146671440000.pdfSupporting Documents · PDF26 Feb 2026View
Planning statementSupporting Documents · PDF26 Feb 2026View
Application formApplication Form (Public) · PDF26 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.