Council planning record

Proposed conversion of dwellinghouse into 7 bedroom, 7 person house in multiple occupation (HMO), rear single-storey extension with green roof, rear dormer extension with green roof, installation of 1x front rooflight, alteration to front and side boundary walls, green roof to existing rear outrigger, demolition of existing front porch, alteration to landscaping and refuse storage to front

3 Lansdowne Grove, London, NW10 1PL

DecidedReference: 25/3575London Borough of Brent

Last published check: 11 Oct 2026, 16:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Full Planning Permission
Received
22 Dec 2025
Validated
22 Dec 2025
Determination deadline
Not published
Local authority
London Borough of Brent

Application overview

Proposed conversion of dwellinghouse into 7 bedroom, 7 person house in multiple occupation (HMO), rear single-storey extension with green roof, rear dormer extension with green roof, installation of 1x front rooflight, alteration to front and side boundary walls, green roof to existing rear outrigger, demolition of existing front porch, alteration to landscaping and refuse storage to front

Proposal details

Reference
25/3575
Alternative references
PP-14563627
Ward
Dollis Hill
Agent
Ward Conservation Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

3 Lansdowne Grove, London, NW10 1PL

This record has no verified map location.

View council map

Documents 16 of 16

DocumentPublishedAction
Location planApproved Drawing Plans · PDF16 Feb 2026View
Existing drawingsApproved Drawing Plans · PDF16 Feb 2026View
Proposed drawingsApproved Drawing Plans · PDF16 Feb 2026View
Urban greening factorApproved Drawing Plans · PDF16 Feb 2026View
Cycle hangar locationApproved Drawing Plans · PDF16 Feb 2026View
Hmo concentrationApproved Drawing Plans · PDF16 Feb 2026View
Fire safety planApproved Drawing Plans · PDF16 Feb 2026View
Pre-existing drawingsApproved Drawing Plans · PDF16 Feb 2026View
Final delegated reportReport · PDF16 Feb 2026View
Final decision noticeDecision (Public) · PDF16 Feb 2026View
Hmo management planApproved Documents · PDF22 Dec 2025View
Fire strategyApproved Documents · PDF22 Dec 2025View
Flood map for planningApproved Documents · PDF22 Dec 2025View
Design and access statementApproved Documents · PDF22 Dec 2025View
Arboricultural impact assessment and method statementApproved Documents · PDF22 Dec 2025View
Application formApplication Form (Public) · PDF22 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permission Granted
Final decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.