Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
1-4 and 9 Watkin Road, Wembley, HA9 0NL
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceNon-material amendment: 1.Addition of an external access door to the bike store. 2.Minor alteration to the layout of the plant acoustic screening enclosure. 3.Additional external doors to the Level 6 external amenity space. 4.Addition of roofing to the plant enclosures. 5.Mounting of smoke extractors at roof level in a horizontal configuration. 6.Relocation of one strip of glazed units from one bay section to an adjacent bay section. 7.Change in specification of one strip of glazed units. 8.Slight increase in the depth of the band at first floor slab level.of full planning permission application reference 22/3965 dated 23/02/2024 for Demolition of existing buildings and construction of two new buildings to provide commercial floorspace (Use Class: E) and student accommodation bedspaces (Use Class: Sui Generis), associated access and highways works, amenity space, cycle parking spaces, disabled car parking spaces and refuse/recycling stores. Subject to a legal agreement under Section 106 of the Town and Country Planning Act 1990 (as amended) dated 23rd of February 2024.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details1-4 and 9 Watkin Road, Wembley, HA9 0NL
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Final delegated reportReport · PDF | 16 Oct 2025 | View |
| Final decision noticeDecision (Public) · PDF | 16 Oct 2025 | View |
| Pcp condition 19 - cycle storageApproved Drawing Plans · PDF | 13 Oct 2025 | View |
| Proposed lb1 basement planApproved Drawing Plans · PDF | 13 Oct 2025 | View |
| Site location planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Cover letterApproved Documents · PDF | 26 Aug 2025 | View |
| Proposed l21 / north roof planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed basement planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed roof planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l03-05 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l07-l08 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l17 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l18 / srf2 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l19-l20 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevation westApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevation south block north elevationApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevation eastApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevation north building south elevationApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevations northApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed sectionApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Basement plansApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Previously approved plansApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Previously approved roof, south and west elevationsApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| North elevationsApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Unseen north elevationsApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l00 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l01 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l02 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l06 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l17 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l27 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed l22-l26 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Proposed elevation southApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l18 / srf2 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l19-l20 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l22-l26 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved south elevationApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved elevation westApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved elevation south block north elevationApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved elevation eastApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved elevation north building south elevationApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved elevations northApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l00 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l01 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l02 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l06 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l17 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l21 / north roof planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l27 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved basement planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved roof planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l03-05 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l07-l08 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Approved l09-l16 floor planApproved Drawing Plans · PDF | 26 Aug 2025 | View |
| Application formApplication Form (Public) · PDF | 26 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.