Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
5 High Road, London, NW10 2TE
Last published check: 30 Sept 2026, 19:57. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceChange of use from Bank (Class E) to a mixed-use comprising ground floor and basement levels commercial unit (Class E) and 6 x self-contained flats, with alterations to shopfront with creation of entrance door direct to the commercial unit, retention of existing entrance door to access the residential accommodation, alterations to rear extension, third floor dormer extension, alterations to fenestration, installation of mezzanine level between ground and first floor, installation of rear balconies to the mezzanine, first, second and third floor flats, removal of existing external staircase and replacement with new external rear staircase with cycle hoist, erection of cycle store at the basement level and cycle storage spaces
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details5 High Road, London, NW10 2TE
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Location & block plansApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing basement planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing first floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing ground floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing roof planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing second floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing site layout planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing third floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Existing sections aa & bbApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed section aaApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed section bbApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed section d-dApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed first floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed second floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed ground floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed mezzanine floor plansApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed roof planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised proposed third floor planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised proposed basement planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Proposed site layout planApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised existing front and east side elevationsApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised existing rear and side elevationsApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised proposed shop front detailsApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised proposed rear and side elevationsApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Revised proposed front and side elevationsApproved Drawing Plans · PDF | 20 Aug 2025 | View |
| Final delegated reportReport · PDF | 20 Aug 2025 | View |
| Final decision noticeDecision (Public) · PDF | 20 Aug 2025 | View |
| Water and energy kiosk specApproved Documents · PDF | 13 Aug 2025 | View |
| Sewage pump specApproved Documents · PDF | 13 Aug 2025 | View |
| Schedule of materialsApproved Documents · PDF | 13 Aug 2025 | View |
| Bnp viability reviewApproved Documents · PDF | 7 Aug 2025 | View |
| Overheating analysisApproved Documents · PDF | 9 May 2025 | View |
| Air quality assessmentApproved Documents · PDF | 9 May 2025 | View |
| Bng exemption letterApproved Documents · PDF | 9 May 2025 | View |
| Built heritage statementApproved Documents · PDF | 9 May 2025 | View |
| Daylight & sunlight assessmentApproved Documents · PDF | 9 May 2025 | View |
| Design & access statementApproved Documents · PDF | 9 May 2025 | View |
| Energy & sustainability statementApproved Documents · PDF | 9 May 2025 | View |
| Planning fire safety strategyApproved Documents · PDF | 9 May 2025 | View |
| Flood risk summaryApproved Documents · PDF | 9 May 2025 | View |
| Digital connectivity statementApproved Documents · PDF | 9 May 2025 | View |
| Planning statementApproved Documents · PDF | 9 May 2025 | View |
| Preliminary roost assessmentApproved Documents · PDF | 9 May 2025 | View |
| Urban greening factorApproved Documents · PDF | 9 May 2025 | View |
| Viability assessmentApproved Documents · PDF | 9 May 2025 | View |
| Application form redactedApplication Form (Public) · PDF | 9 May 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.