Council planning record

Demolition of ground floor rear of dwellinghouse, rear conservatory and rear shed, construction of ground floor side and rear extension, rear dormer, rebuilding of x2 chimney stack tops, installation of 1x front rooflight and 1x rooflight to rear outrigger, alteration to side fenestration, replacement of all existing PVC windows with timber sash windows, side boundary wall treatment and installation of ventilation system and air source heat pump to rear of dwellinghouse

28 Milman Road, London, NW6 6EG

DecidedReference: 25/0082London Borough of Brent

Last published check: 4 Oct 2026, 04:31. Check the council record for more recent changes.

Application location

28 Milman Road, London, NW6 6EG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Householder
Received
10 Jan 2025
Validated
20 Jan 2025
Determination deadline
Not published
Local authority
London Borough of Brent

Application overview

Demolition of ground floor rear of dwellinghouse, rear conservatory and rear shed, construction of ground floor side and rear extension, rear dormer, rebuilding of x2 chimney stack tops, installation of 1x front rooflight and 1x rooflight to rear outrigger, alteration to side fenestration, replacement of all existing PVC windows with timber sash windows, side boundary wall treatment and installation of ventilation system and air source heat pump to rear of dwellinghouse

Proposal details

Reference
25/0082
Alternative references
PP-13687156
Ward
Queens Park
Agent
Architecture for London

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 43 of 43

DocumentPublishedAction
Location planApproved Drawing Plans · PDF24 Mar 2025View
Proposed ground floor planApproved Drawing Plans · PDF24 Mar 2025View
Proposed front elevationApproved Drawing Plans · PDF24 Mar 2025View
Proposed section aaApproved Drawing Plans · PDF24 Mar 2025View
Proposed section c-cApproved Drawing Plans · PDF24 Mar 2025View
Window 01-03 detailsApproved Drawing Plans · PDF24 Mar 2025View
Window 04 detailsApproved Drawing Plans · PDF24 Mar 2025View
Window details w11-w13Approved Drawing Plans · PDF24 Mar 2025View
Window 14 detailsApproved Drawing Plans · PDF24 Mar 2025View
Window 15 detailsApproved Drawing Plans · PDF24 Mar 2025View
Window 16 - 27 detailsApproved Drawing Plans · PDF24 Mar 2025View
Window 18-19 detailsApproved Drawing Plans · PDF24 Mar 2025View
Existing ground floor planApproved Drawing Plans · PDF24 Mar 2025View
Existing first floor planApproved Drawing Plans · PDF24 Mar 2025View
Existing loft floor planApproved Drawing Plans · PDF24 Mar 2025View
Existing roof planApproved Drawing Plans · PDF24 Mar 2025View
Existing front elevationApproved Drawing Plans · PDF24 Mar 2025View
Existing side elevationApproved Drawing Plans · PDF24 Mar 2025View
Existing rear elevationApproved Drawing Plans · PDF24 Mar 2025View
Existing section a-aApproved Drawing Plans · PDF24 Mar 2025View
Existing section c-cApproved Drawing Plans · PDF24 Mar 2025View
Ground floor demolition planApproved Drawing Plans · PDF24 Mar 2025View
Demolition roof planApproved Drawing Plans · PDF24 Mar 2025View
Demolition front elevationApproved Drawing Plans · PDF24 Mar 2025View
Demolition rear elevationApproved Drawing Plans · PDF24 Mar 2025View
Demolition section a-aApproved Drawing Plans · PDF24 Mar 2025View
Demolition section c-cApproved Drawing Plans · PDF24 Mar 2025View
Demolition loft floor planApproved Drawing Plans · PDF24 Mar 2025View
Proposed second floor planApproved Drawing Plans · PDF24 Mar 2025View
Proposed roof planApproved Drawing Plans · PDF24 Mar 2025View
Proposed first floor planApproved Drawing Plans · PDF24 Mar 2025View
Demolition side elevationApproved Drawing Plans · PDF24 Mar 2025View
Demolition first floor planApproved Drawing Plans · PDF24 Mar 2025View
Proposed rear elevationApproved Drawing Plans · PDF24 Mar 2025View
Proposed side elevationApproved Drawing Plans · PDF24 Mar 2025View
Final delegated reportReport · PDF24 Mar 2025View
Final decision noticeDecision (Public) · PDF24 Mar 2025View
Materials detailsApproved Documents · PDF19 Mar 2025View
Heat pump specificationApproved Documents · PDF13 Jan 2025View
Mechanical ventilation with heat recovery informationApproved Documents · PDF13 Jan 2025View
Design, access & heritage statementApproved Documents · PDF13 Jan 2025View
Plant noise assessmentApproved Documents · PDF13 Jan 2025View
Application formApplication Form (Public) · PDF13 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Permission Granted
Final decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.