Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Former Phase 2 (Blocks E-F) - Land Former 17 Northfields, Beresford Avenue, Wembley
Former Phase 2 (Blocks E-F) - Land Former 17 Northfields, Beresford Avenue, Wembley
This record has no verified map location.
View council mapDetails pursuant to condition 13 (Contaminated Land Report) for Phase 2 (Blocks E-F) of Variation of Conditions reference 19/2732 dated 4 October, 2019, for Minor material amendment under Section 73 of the Town and Country Planning Act 1990 to vary the wording of condition 6 (outline approved drawings) to allow:An increase in the proposed parameter height for Plot E to a maximum between 86.60m AOD ? 92.90m AODof Outline Planning Permission reference 18/0321 dated 28 September, 2018 for Hybrid planning permission for the redevelopment of the former Northfields Industrial Estate:Outline planning permission for the demolition of existing buildings and structures on the site, all site preparation works and redevelopment to provide new buildings ranging from 35.75m AOD to 111.95m AOD in height, with a total floorspace (GEA) of up to 322,019 sq m (excluding basement up to 42,000 sq m GEA) to accommodate 3,030 homes (Use Class C3), business and storage and distribution (Use Classes B1a, B1c and B8), commercial (Use Classes A1, A2, A3, A4 and A5), community and leisure (Use Classes D1 and D2) including community centre and nursery, new basement level including energy centre, associated storage, cycle and vehicle parking, new vehicular accesses, associated highway works to Beresford Avenue, landscaping and creation of new public and private open space, ancillary facilitating works, various temporary meanwhile uses, interim works and infrastructure.Full planning permission for demolition of existing buildings and structures on the site, all site preparation works and the development of Phase 1 (Buildings A, B, C and D ranging from 1 to 14 storeys in height) to comprise 400 homes (Use Class C3); 910 sq m (GEA) of business floorspace Use Class B1a); 1,290 sq m (GEA) of commercial floorspace (Use Classes A1, A2, A3, A4 and A5); and 1,610 sq m (GEA) of community and leisure floorspace (Use Classes D1 and D2), including a community centre and nursery; together with new basement level including energy centre, associated storage, cycle and vehicle parking, new vehicular accesses, associated highway works to Beresford Avenue, landscaping and creation of new public and private open space, ancillary facilitating works, various temporary meanwhile uses, interim works and infrastructure.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Final delegated reportReport · PDF | 30 Sept 2024 | View |
| Final decision noticeDecision (Public) · PDF | 30 Sept 2024 | View |
| Soil verification visit reportApproved Documents · PDF | 13 Aug 2024 | View |
| Cover letterApproved Documents · PDF | 13 Aug 2024 | View |
| Application form redactedApproved Documents · PDF | 13 Aug 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.