1 x Prunus (applicants ref. T10) - Reduce the tree to approximately 0.5m in height, keeping it below the level of the brickwork, bringing lateral growth to shape by 0.5m. Standing in Group G127 of Tree Preservation Order.1 x Pine Tree (applicants ref. T11) - Crown reduction by 1.5m in height bringing lateral growth to shape, by 1m. Leaving the tree a standing height of 5m. Standing in Group G127 of Tree Preservation Order.1 x Dead Conifer (applicants ref. T12) - Remove the deceased/dead Conifer tree and cut down to ground level. Standing in Group G127 of Tree Preservation Order. (Exempt works)1 x Laburnum Tree (applicants ref. T13) - Reducing shape by 2m in height bringing lateral growth to shape by 1.5m. Standing in Group G128 of Tree Preservation Order.
1 x Prunus (applicants ref. T10) - Reduce the tree to approximately 0.5m in height, keeping it below the level of the brickwork, bringing lateral growth to shape by 0.5m. Standing in Group G127 of Tree Preservation Order.1 x Pine Tree (applicants ref. T11) - Crown reduction by 1.5m in height bringing lateral growth to shape, by 1m. Leaving the tree a standing height of 5m. Standing in Group G127 of Tree Preservation Order.1 x Dead Conifer (applicants ref. T12) - Remove the deceased/dead Conifer tree and cut down to ground level. Standing in Group G127 of Tree Preservation Order. (Exempt works)1 x Laburnum Tree (applicants ref. T13) - Reducing shape by 2m in height bringing lateral growth to shape by 1.5m. Standing in Group G128 of Tree Preservation Order.
Reference
TPP/0762/26
Alternative references
PP-15395611
Ward
Whetstone
Agent
Thor's Trees
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.