ApprovedCouncil status: Approved subject to conditions
External alterations including amendments to ground floor flat roof and parapet, conversion of garage to habitable space at lower ground floor including replacement of garage door with new door and windows and reconfiguration of external land. New outdoor pool with associated hard landscaping and plant equipment in lower part of rear garden, internal reconfiguration of existing dwelling including alterations to lower ground floor layout and to provide corridor access to the separated gym and cinema area , installation of new lift and associated works, replacement of stairs and lower and ground floor levels, 5no. new rooflights at second floor level located on crown roof, relocation of 2no. ac units from the rear elevation to roof
External alterations including amendments to ground floor flat roof and parapet, conversion of garage to habitable space at lower ground floor including replacement of garage door with new door and windows and reconfiguration of external land. New outdoor pool with associated hard landscaping and plant equipment in lower part of rear garden, internal reconfiguration of existing dwelling including alterations to lower ground floor layout and to provide corridor access to the separated gym and cinema area , installation of new lift and associated works, replacement of stairs and lower and ground floor levels, 5no. new rooflights at second floor level located on crown roof, relocation of 2no. ac units from the rear elevation to roof
Reference
26/2217/LBC
Alternative references
PP-14989794
Ward
Garden Suburb
Agent
Rebecca Robson
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.