Variation of conditions 1 (Approved Plans) of planning permission reference 23/4500/FUL dated 15/02/24 for 'Demolition of existing equine facilities and replacement with modern equine yard including: Erection of an eight-box traditional yard; a hay barn; eight-box American Barn; Storage building and service yard; Ancillary equine facilities a muck bunker and all weather turnout pen/mini man�ge; Office and administration buildings, including, main office, a private office, a briefing room, a kitchen/mess space and WCs; covered picnic area.' Variation to include, Addition of a cover to the turnout pen; Associated minor layout amendments; Replacement of the pre-commencement conditions (3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 16 and 17) with compliance conditions
Variation of conditions 1 (Approved Plans) of planning permission reference 23/4500/FUL dated 15/02/24 for 'Demolition of existing equine facilities and replacement with modern equine yard including: Erection of an eight-box traditional yard; a hay barn; eight-box American Barn; Storage building and service yard; Ancillary equine facilities a muck bunker and all weather turnout pen/mini man�ge; Office and administration buildings, including, main office, a private office, a briefing room, a kitchen/mess space and WCs; covered picnic area.' Variation to include, Addition of a cover to the turnout pen; Associated minor layout amendments; Replacement of the pre-commencement conditions (3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 16 and 17) with compliance conditions
Reference
26/1798/S73
Alternative references
PP-14882388
Ward
Underhill
Agent
KWA Architects (Cambridge) Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.