Internal and external refurbishment of the building and improvements to the surrounding public realm, together with administrative facilities. Internal rearrangement of stage area and access including reintroduction of a raised stage and removal of some non-original partitions to improve circulation and equal access. General refurbishment of historic lighting fixtures, doors and seating and introduction of external secondary glazing to some lights within auditorium or acoustic and thermal isolation. Isolated removal of non-original partitions across the ground, first and second floors. External remedial works to the buildings elevations and forecourt areas including patchwork repair and repainting. Reinstatement of a metal canopy over the south and west elevations. Replacement or additional plant on roof and new photovoltaic panels. Relandscaping of the adjacent public realm, including the reopening of the area alongside the west elevation and improvement of level access to the main entrance; repaving along the west elevation. Remodelling of loading bay and creation of new service entry point and two new smoke extract hatches in rear (east) wall. Additional signage and external lighting. New main entrance steps
Internal and external refurbishment of the building and improvements to the surrounding public realm, together with administrative facilities. Internal rearrangement of stage area and access including reintroduction of a raised stage and removal of some non-original partitions to improve circulation and equal access. General refurbishment of historic lighting fixtures, doors and seating and introduction of external secondary glazing to some lights within auditorium or acoustic and thermal isolation. Isolated removal of non-original partitions across the ground, first and second floors. External remedial works to the buildings elevations and forecourt areas including patchwork repair and repainting. Reinstatement of a metal canopy over the south and west elevations. Replacement or additional plant on roof and new photovoltaic panels. Relandscaping of the adjacent public realm, including the reopening of the area alongside the west elevation and improvement of level access to the main entrance; repaving along the west elevation. Remodelling of loading bay and creation of new service entry point and two new smoke extract hatches in rear (east) wall. Additional signage and external lighting. New main entrance steps
Reference
26/1503/LBC
Alternative references
PP-14878312
Ward
Childs Hill
Agent
Flanagan Lawrence
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.