Council planning record

Solar PV Installation on the roof at the rear of the building on the wardsborough road (this is on a newer building extension added to the listed building). Solar PV mounting kit is tilted system that will be ballasted and not fixed to the roof permenantly. so can be removed easily if required. 28 panels to be placed and spaced on the roof to gain maximum production whilst having minimum impact to the building. Plans show the panels are barely visable from both the front AND side elevations

Exodus, 29 Railway Street, Lisburn, BT28 1XP

Site Inspection CompleteReference: LA05/2026/0675/LBCLisburn and Castlereagh City Council

Last published check: 29 Sept 2026, 15:39. Check the council record for more recent changes.

Application location

Exodus, 29 Railway Street, Lisburn, BT28 1XP

This record has no verified map location.

Application summary

Status
Site Inspection Complete
Application type
Listed Building Consent
Received
21 Aug 2026
Validated
21 Aug 2026
Determination deadline
Not published
Local authority
Lisburn and Castlereagh City Council

Application overview

Solar PV Installation on the roof at the rear of the building on the wardsborough road (this is on a newer building extension added to the listed building). Solar PV mounting kit is tilted system that will be ballasted and not fixed to the roof permenantly. so can be removed easily if required. 28 panels to be placed and spaced on the roof to gain maximum production whilst having minimum impact to the building. Plans show the panels are barely visable from both the front AND side elevations

Proposal details

Reference
LA05/2026/0675/LBC
Alternative references
PP-14929794
Ward
Hilden
Agent
Roger O'Kane

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Application Form - Without Personal DataApplication Form24 Aug 2026View
Historic Environment Division (HED) responseConsultation Responses28 Sept 2026View
Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor25 Aug 2026View
Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor24 Aug 2026View
Panels will not be see from the road as the roof slopes away from it. access to roof is through alley using aluminium towers and ladders. Panels to be fitted on the new extension roof...not the listed building.Other Supporting Information24 Aug 2026View
mounting kit infoOther Supporting Information24 Aug 2026View
site location plan 01Site Location Plan24 Aug 2026View
existing floor plans 02Existing Plans24 Aug 2026View
existing elevations 03Existing Elevations24 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Date last advertised

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Site Inspection Complete
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.