To vary conditions 3 and 9 of planning permission 22/1342/CCC to increase the maximum annual throughput limit for inert and non-hazardous construction, demolition and excavation waste from 30,000 tonnes per annum to 75,000 tonnes per annum and to extend temporary consent for a further three years
To vary conditions 3 and 9 of planning permission 22/1342/CCC to increase the maximum annual throughput limit for inert and non-hazardous construction, demolition and excavation waste from 30,000 tonnes per annum to 75,000 tonnes per annum and to extend temporary consent for a further three years
Reference
PL/0050/24
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.