Council planning record

Crown lift to 3 metres above ground level over footpath and by 1 metre over Highway, removal of epicormic growth from stem to crown thin by 20%, 1 metre lateral branch reductions to create radial clearance from the fabric of the building of no 2 Lime trees (T1 and T2)

1 Greenwood Drive Lichfield Staffordshire WS14 9AG

DecidedReference: 22/01007/TPOLichfield District Council

Last published check: 28 Sept 2026, 22:41. Check the council record for more recent changes.

Application location

1 Greenwood Drive Lichfield Staffordshire WS14 9AG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Tree Preservation Order
Received
4 Jul 2022
Validated
6 Jul 2022
Determination deadline
31 Aug 2022
Local authority
Lichfield District Council

Application overview

Crown lift to 3 metres above ground level over footpath and by 1 metre over Highway, removal of epicormic growth from stem to crown thin by 20%, 1 metre lateral branch reductions to create radial clearance from the fabric of the building of no 2 Lime trees (T1 and T2)

Proposal details

Reference
22/01007/TPO
Ward
St Johns
Parish
Lichfield City
Agent
Annalize Wright

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 2 of 2

DocumentPublishedAction
ApplicationformredactedApplication Form · PDF4 Jul 2022View
5f9a7d09-c4a2-48c8-acf1-4dc595f10b61Location / Block / Site Plan4 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

TPO Works Consented
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.