Schedule 17 Phase 2a application Area 3 (application 5) : Earthworks required for the creation of two ecological mitigation ponds and one associated bund

Land To The North And West Of Rake End Blithbury Lichfield Staffordshire

DecidedReference: 22/00638/HSTLichfield District Council

Last published check: 29 Sept 2026, 04:58. Check the council record for more recent changes.

Application location

Land To The North And West Of Rake End Blithbury Lichfield Staffordshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
High Speed Two 2a
Received
21 Apr 2022
Validated
21 Apr 2022
Determination deadline
16 Jun 2022
Local authority
Lichfield District Council

Application overview

Schedule 17 Phase 2a application Area 3 (application 5) : Earthworks required for the creation of two ecological mitigation ponds and one associated bund

Proposal details

Reference
22/00638/HST
Ward
Colton And The Ridwares
Parish
Mavesyn Ridware
Agent
Mr Ulrich Vosloo

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
Whst17 decision notice sch 17Decision Notice · PDF13 Jun 2022View
Planning reportPlanning Report8 Jun 2022View
_ ecology manager - ldcConsultation Responses · PDF25 May 2022View
_ environmental health officer - ldcConsultation Responses · PDF19 May 2022View
_ arboricultural officer - ldcConsultation Responses · PDF16 May 2022View
Rights of wayConsultation Responses · PDF4 May 2022View
ApplicationformredactedApplication Form · PDF21 Apr 2022View
2ee02-baf-tp-tem-ws02-000037Additional Information · PDF21 Apr 2022View
Covering letterAdditional Information · PDF21 Apr 2022View
Written statementPlanning Statement · PDF21 Apr 2022View
Earthworks plan site 209Location / Block / Site Plan · PDF21 Apr 2022View
Earthworks plan site 209Proposed Plans / Elevations · PDF21 Apr 2022View
Medium pond plan and sectionsProposed Plans / Elevations · PDF21 Apr 2022View
Small pond plan and sectionsProposed Plans / Elevations · PDF21 Apr 2022View
Site 212 landscape general arrangement planProposed Plans / Elevations · PDF21 Apr 2022View
Hedgerows -typical details, sheet 1Proposed Plans / Elevations · PDF21 Apr 2022View
Hedgerows -typical details, sheet 2Proposed Plans / Elevations · PDF21 Apr 2022View
Hibernacula typical detailsProposed Plans / Elevations · PDF21 Apr 2022View
Bird box - typical details phase 2a wideProposed Plans / Elevations · PDF21 Apr 2022View
Woodland matrix detailsProposed Plans / Elevations · PDF21 Apr 2022View
Woodland detailProposed Plans / Elevations · PDF21 Apr 2022View
Tree planting detailProposed Plans / Elevations · PDF21 Apr 2022View
Bird box - typical details phase 2a wideProposed Plans / Elevations · PDF21 Apr 2022View
Grassland habitatsProposed Plans / Elevations · PDF21 Apr 2022View
Site 209 landscape general arrangement planProposed Plans / Elevations · PDF21 Apr 2022View
Site location plan ponds and wetlands area 3Location / Block / Site Plan · PDF21 Apr 2022View
Local authority s17 areas and application boundariesLocation / Block / Site Plan · PDF21 Apr 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
Whst17 decision notice sch 17
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.