Construction of a sustainable mixed use urban extension, comprising of up to 450 dwellings; a primary school, mixed use community hub to include retail development (A1/A2/A3/A4/A5) and community buildings (D1); comprehensive green infrastructure including footpaths, cycleways, multi functional openspace including childrens play areas, open space for sport and sustainable urban drainage systems; foul and surface water drainage infrastructure including balancing ponds; safeguarded route of Lichfield Canal; link road to form part of Lichfield Southern Bypass; site vehicular access point opposite Shell Garage, London Road; demolition of no 22 London Road to allow provision of second vehicular access from London Road and other associated ancillary infrastructure and ground remodeling.
Land South Of Shortbutts Lane Lichfield Staffordshire
Construction of a sustainable mixed use urban extension, comprising of up to 450 dwellings; a primary school, mixed use community hub to include retail development (A1/A2/A3/A4/A5) and community buildings (D1); comprehensive green infrastructure including footpaths, cycleways, multi functional openspace including childrens play areas, open space for sport and sustainable urban drainage systems; foul and surface water drainage infrastructure including balancing ponds; safeguarded route of Lichfield Canal; link road to form part of Lichfield Southern Bypass; site vehicular access point opposite Shell Garage, London Road; demolition of no 22 London Road to allow provision of second vehicular access from London Road and other associated ancillary infrastructure and ground remodeling.
Reference
12/00182/OUTMEI
Ward
St Johns
Parish
Lichfield City
Agent
Pegasus Planning Group
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.